Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Replacement Of Existing Damaged U.G Cable With New One From Main Panel To Sub Main Panel In The Central Workshop, Transport Department Under Section Ii Of Sub Division Ii, Workshop Division, Apwd, Port Blair
|
Description |
Replacement Of Existing Damaged U.G Cable With New One From Main Panel To Sub Main Panel In The Central Workshop, Transport Department Under Section Ii Of Sub Division Ii, Workshop Division, Apwd, Port Blair
|
Organisation | Chief Engineer Andaman Public Works Department (APWD) | State Govt. and UT |
Tender Id | 2025_APWD_17312_1 |
Reference Number |
NIT.198/NIT/WSD/2024-25 |
Tender Fee | 0 |
EMD | 6983 |
Tender Value | |
Place | Sri Vijaya Puram |
Link | https://eprocure.andaman.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=18402 |
Start Date | January 16, 2025 23:30 |
End Date |
24/01/2025 ( Expired 155 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repair and renovation of type-iii quarter from 23 to 34 block no. 05 and 06 under sub division no. iv, cd-ii, apwd, prothrapur.
Repair and renovation of type-iii quarter from 23 to 34 block no. 05 and 06 under sub division no. iv, cd-ii, apwd, prothrapur.
Read moreRe-surfacing of internal roas inside residential qtrs from ty-i,ii and ty-iii under sub-division no.iv, cd-ii,apwd, prothrapur.
Re-surfacing of internal roas inside residential qtrs from ty-i,ii and ty-iii under sub-division no. iv, cd-ii,apwd, prothrapur.
Read moreT/m of drainage system under r-ii division. sh - replacement of existing damaged slab and filter media of rwh pits under r-ii division.
T/m of drainage system under r-ii division. sh - replacement of existing damaged slab and filter media of rwh pits under r-ii division.
Read moreConstruction of 33 kv ug line with xlpe cable along with metering installation for new mother and child hospital under deposit work scheme of ulubari electrical sub-division on full turnkey mode.
Construction of 33 kv ug line with xlpe cable along with metering installation for new mother and child hospital under deposit work scheme of ulubari electrical sub-division on full turnkey mode.
Read moreReplacement and renovation of existing sodium vapour street light fittings with new 250w led fittings at different roads and sitc of 2nos 20m new high mast incl. allied cabling works under kolkata electrical division, pwd.
Replacement and renovation of existing sodium vapour street light fittings with new 250w led fittings at different roads and sitc of 2nos 20m new high mast incl. allied cabling works under kolkata electrical division, pwd.
Read moreReplacement of damaged 6 mm thick reinforced cement corrugated sheet with new one and fixing of chain link fencing and allied work at sub engineer (vihar lake) office at vihar lake under aeoc(tm) division in s ward.
Replacement of damaged 6 mm thick reinforced cement corrugated sheet with new one and fixing of chainlink fencing and allied work at sub engineer (vihar lake) office at vihar lake under aeoc(tm) division in s ward.
Read moreReplacement of wooden door and s of 18 nos. ty-iii qtrs. at satellite township colony under sub division no. iii, cd-ii, apwd, prothrapur.
Replacement of wooden door and s of 18 nos. ty-iii qtrs. at satellite township colony under sub division no. iii, cd-ii, apwd, prothrapur.
Read moreReplacement of lengthy pvc with overhead conductor from 250kva dtr je office, 63kva additional hathithan and 100kvahigh school in (e) section parla bhunter (local-ii) under esd, hpsebl, bhuntar
Replacement of lengthy pvc with overhead conductor from 250kva dtr je office, 63kva additional hathithan and 100kvahigh school in (e) section parla bhunter (local-ii) under esd, hpsebl, bhuntar
Read moreShifting of lt line 3-phase crossing over plots at village rehal bated from existing 63kvs sstn. rehal bated in e section dhundan under electrical sub-division, hpsebl, darlaghat
Shifting of lt line 3-phase crossing over plots at village rehal bated from existing 63kvs sstn. rehal bated in e section dhundan under electrical sub-division, hpsebl, darlaghat
Read moreAugmentation of capacity of ptr from (3x10) mva to (4x10)mva with allied works at bagjola 33/11kv sub- station under bidhannagar ii division
Augmentation of capacity of ptr from (3x10) mva to (4x10)mva with allied works at bagjola 33/11kv sub- station under bidhannagar ii division
Read moreof your Industry type