Tender Details
Particulars | Details |
---|---|
Title |
Internal Electrification Renovation And Other Repair Work As Per The Requirement Of Electrical Audit In 05 Health Unit At District Tikamgarh And Niwadi
|
Description |
Internal Electrification Renovation And Other Repair Work As Per The Requirement Of Electrical Audit In 05 Health Unit At District Tikamgarh And Niwadi
|
Organisation | Government of Madhya Pradesh |
Tender Id | 2023_DHS_297407_1 |
Reference Number |
NIT 06 Sagar DN |
Tender Fee | 5000 |
EMD | 50000 |
Tender Value | |
Place | Bhopal |
Link | https://mptenders.gov.in |
Start Date | August 12, 2023 22:20 |
End Date |
23/08/2023 ( Expired 628 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repair and rehabilitation of 05 nos. bridges
Repair and rehabilitation of 05 nos. bridges of nh-512 under n.h. division no. vii, p.w. roads directorate in the district of dakshin dinajpur, west bengal during the year 2024-25 on sbd mode. job no. nh-512/wb/2024-25/565
Read moreConstruction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala
Construction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala
Read moreC/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
Read moreManufacture and supply of 24000 nos of 9 m 300kg wl psc poles as per rec design cast in twin mould form boxes at poothamedu psc yard for a period of two years
Manufacture and supply of 24000 nos of 9 m 300kg wl psc poles as per rec design cast in twin mould form boxes at poothamedu psc yard for a period of two years
Read moreRepair / maint to sewage line, manhole, septic tanks and misc works at officer married accn , adm regt , mh asc unit , mes, hq army ad college of zone a area other misc works under ge i gos.
Repair / maint to sewage line, manhole, septic tanks and misc works at officer married accn , adm regt , mh asc unit , mes, hq army ad college of zone a area other misc works under ge i gos.
Read more85932 repair/maintenance of transformer, ht ug cables, god, ht distribution system, poles, protective devices, earthing and other misc work of electric supply in area no. i and ii and other area of age em-i under ge (south) pune
85932 repair/maintenance of transformer, ht ug cables, god, ht distribution system, poles, protective devices, earthing and other misc work of electric supply in area no. i and ii and other area of age em-i under ge (south) pune
Read moreSupply of electrical materials for the repair and maintenance of street lights as per the boq
Supply of electrical materials for the repair and maintenance of street lights as per the boq
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreProviding laying jointing and interconnection work of hdpe pipeline at surajmal jain nagar ratlam as per estimate
Providing laying jointing and interconnection work of hdpe pipeline at surajmal jain nagar ratlam as per estimate
Read moreof your Industry type