Tender Details
Particulars | Details |
---|---|
Title |
Kandla Mcc Room Panel Civil Work And Chequred Plate On Cable Trenches.
|
Description |
Kandla Mcc Room Civil Work Panel Chequred Plates On Cable Trenches Qra Closure Of Mcc Room Entrance From Pump Side Associate Works.
|
Organisation | Bharat Petroleum Corporation Limited | Public Sector Undertakings |
Tender Id | 2024_BPCL_17197 |
Reference Number |
1000421335 |
Tender Fee | 0 |
EMD | 1 Lakh |
Tender Value | |
Place | Mumbai |
Link | https://bpcltenders.eproc.in |
Start Date | July 19, 2024 02:30 |
End Date |
01/08/2024 ( Expired 302 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Read moreRectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreWork of installing railing and increasing the height of railing on asafnagar head regulator installed at km. 34.630 on upper ganga canal.
Work of installing railing and increasing the height of railing on asafnagar head regulator installed at km. 34.630 on upper ganga canal.&#x0d
Read moreRoller repair and overhauling work on gates of shahdara drain and hindon cut canal regulator new delhi.
Roller repair and overhauling work on gates of shahdara drain and hindon cut canal regulator new delhi.&#x0d
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreWork of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Read moreProviding civil work for sanding booth system facility and flash off system at panel beml limited bangalore complex
Providing civil work for sanding booth system facility and flash off system at panel beml limited bangalore complex
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreof your Industry type