Tender Details
Particulars | Details |
---|---|
Title |
He9751592097 Globe Valve Cs 1" Cl 1500 Sw Ends,He9751592119 Globe Valve Cs 2" Cl 1500 Sw Ends,He975
|
Description |
|
Organisation | Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises |
Tender Id | GEM/2025/R/477682 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | April 16, 2025 15:30 |
End Date |
17/04/2025 ( Expired 5 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Well hd x 4cp 15m, 20 in x13.3/8" x9.5/8* (edp-165103003),x-mas tree 2-9/16" x 2-1/16" -15m (edp-16
Read more
Hiring of model- 25/latest model of 1 no. omni bus/traveler (t-2), 25-1 seating capacity or equivalent sel vehicle for utilization period of bus up to 03 years or 2,50,000 kms for ae(tlm) sub dn., mpptcl, satna
Hiring of model- 25/latest model of 1 no. omni bus/traveler (t-2), 25-1 seating capacity or equivalent sel vehicle for utilization period of bus up to 03 years or 2,50,000 kms for ae(tlm) sub dn., mpptcl, satna
Read moreObs inlet air filter dry b type,valve assyi l hv sp ex45 trc 2,valve assly dis hvsp,valve finger ty
Read more
Internal improvement works of (package-21) for water supply scheme 1. pucca chisti 2. churiwala chisti 3. khan wala , block fazilka, distt. fazilka (under nabard xxvii/jjm)
Internal improvement works of (package-21) for water supply scheme 1. pucca chisti 2. churiwala chisti 3. khan wala , block fazilka, distt. fazilka (under nabard xxvii/jjm)
Read moreShort term maintenance contracts from km 0/0-1/6, km1/6-2/6, km 4/6-6/6, km 11/6-12/6 of nh 381a vellakovil - sankagiri road in the state of tamil nadu for the year 2024-25
Short term maintenance contracts from km 0/0-1/6, km1/6-2/6, km 4/6-6/6, km 11/6-12/6 of nh 381a vellakovil - sankagiri road in the state of tamil nadu for the year 2024-25
Read moreBiennial maintenance of ash slurry line extension at different dp and dp changeover (both phase #1 and phase # 2) inside ash pond of sgtpp
Biennial maintenance of ash slurry line extension at different dp and dp changeover (both phase #1 and phase #2) inside ash pond of sgtpp.
Read moreMachinery spares 1,machinery spares 2,machinery spares 3,machinery spares 4,machinery spares 5,mach
Read more
Inviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Inviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Inviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Read moreof your Industry type