Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Engineering Hub Building,
|
| Description |
Engineering Hub Building
|
| Organisation | Municipal Corporation of Greater Mumbai | State Govt. and UT |
| Tender Id | 2025_MCGM_1158962_1 |
|
Reference Number |
ch.eng.me/7395 dt.10.03.2025 |
| Tender Fee | 4394 |
| EMD | 21600 |
| Tender Value | |
| Place | deonar |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2016719 |
| Start Date | March 11, 2025 16:30 |
| End Date |
Expired
18/03/2025
Expired 474 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of ujjain airport, ujjain madhya pradesh. sh detailed designing engineering, procurement and construction of new domestic terminal building and allied works
Development of ujjain airport, ujjain, madhya pradesh. sh detailed designing, engineering, procurement and construction of new domestic terminal building and allied works
Read more1) condenser fan blade suitable for 1400 rpm motor, made from frp material with aluminum hub, overall unit dia 580 mm 2) condenser fan blade suitable for 1400 rpm motor, made from frp material with aluminum hub, overall unit dia 610 mm,
For complete deion and other details, please refer to tender
Read moreRequest for proposal (rfp) for retrofitting, operation, and maintenance of the sourcing hub at moradabad through a design build finance operate transfer (dbfot) framework
Rfp
Read moreDesign engineering manufacturing inspection supply erection testing commissioning performance trial of steam coil air preheater scaph to hbl sugauli plant
Design engineering manufacturing inspection supply erection testing commissioning performance trial of steam coil air preheater scaph to hbl sugauli plant
Read moreSpecial repair to cnc hub at tool room at 510 abw under age b/r-ii and age e/m-i of ge (north) meerut cantt
Special repair to cnc hub at tool room at 510 abw under age b/r-ii and age e/m-i of ge (north) meerut cantt
Read moreConstruction of skywalk with travelators at anand vihar multimodal hub for seamlessly connectivity between anand vihar railway station to isbt, kuashambi. for complete work details (please refer ifb).
Construction of skywalk with travelators at anand vihar multimodal hub for seamlessly connectivity between anand vihar railway station to isbt, kuashambi. for complete work details (please refer ifb).
Read moreDesign, engineering, supply, installation and commissioning of 757 kwp / 742 kw or above capacity on-grid rooftop solar power plant on 11 identified buildings
Design, engineering, supply, installation and commissioning of 757 kwp / 742 kw or above capacity on-grid rooftop solar power plant on 11 identified buildings
Read moreTin shade and paver block work at newly constructed visual building, ucssh
Tin shade and paver block work at newly constructed visual building, ucssh
Read moreAll type building material supply for construction required gp temburwahi 2026-27
All type building material supply for construction required gp temburwahi 2026-27
Read moreof your Industry type