Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Widening And Strengthening Work Of Tundla Etah Road Sh 31 In Km 27 To 35 With 02 Lane Paved Shoulder In Fy 2025 26 In District Etah (Length 9.000 Km) (With 5 Year Maintenance)
|
| Description |
Widening And Strengthening Work Of Tundla Etah Road Sh 31 In Km 27 To 35 With 02 Lane Paved Shoulder In Fy 2025 26 In District Etah (Length 9.000 Km) (With 5 Year Maintenance)
|
| Organisation | Chief Engineer Aligarh Zone PWD Aligarh | State Govt. and UT |
| Tender Id | 2026_CEALG_1103644_1 |
|
Reference Number |
7131_Cashier Dt 16.12.2025 |
| Tender Fee | 2354 |
| EMD | 33.83 Lakh |
| Tender Value | - |
| Place | ETAH |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2035403 |
| Start Date | January 05, 2026 17:30 |
| End Date |
Expired
12/01/2026
Expired 275 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Read moreConsultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka
Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka
Read moreWidening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
Widening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
Read moreWidening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh
Widening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreWidening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Read moreWidening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 68.600 to km. 162.700 and km. 178.400 to km. 183.732 of nh-326 in the state of odisha under epc mode (package-1)
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 68.600 to km. 162.700 and km. 178.400 to km. 183.732 of nh-326 in the state of odisha under epc mode (package-1)
Read moreWidening and strengthening/reconstruction work of govindpur-sahebganj adb road (sh-18) from km 139.00 to km 190.930 (total length-51.930 km) road to two lane with paved shoulder under road division dumka for the year 2026-27.
Widening and strengthening/reconstruction work of govindpur-sahebganj adb road (sh-18) from km 139.00 to km 190.930 (total length-51.930 km) road to two lane with paved shoulder under road division dumka for the year 2026-27.
Read moreWidening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand
Widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand
Read moreWidening and strengthening of the existing 2-lane road to 2-lane road with paved shoulder from km 239.280 (koksara) to km 294.280 (nabarangpur) on nh-26 in kalahandi and nabarangpur districts in the state of odisha under the epc mode
Widening and strengthening of the existing 2-lane road to 2-lane road with paved shoulder from km 239.280 (koksara) to km 294.280 (nabarangpur) on nh-26 in kalahandi and nabarangpur districts in the state of odisha under the epc mode
Read moreof your Industry type