Tender Details

Particulars Details
Title
Construction Of Back Side Boundary Wall For Shed At General Workshop Dhulkote
Description
Rcc Work, Brick Work, Plaster, Steel Work Etc.
Organisation Government of Haryana
Tender Id 2023_HBC_302693_1
Reference
Number
2023CC8ECCC5 30F9 4786 95A8 E17E71B5F1FB963UHB
Tender Fee 500
EMD 15778
Tender Value
Place XEN Civil Const. Panchkula
Link
View Original Tender Notice

https://etenders.hry.nic.in

Start Date August 09, 2023 22:15
End Date
Expired 17/08/2023

Expired 1070 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Construction of drainage at mgr nagar in narasingarayanpettai

Construction of drainage at mgr nagar in narasingarayanpettai

Read more
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Read more
Detailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode

Detailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.

Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.

Read more
Plantation and maintenance of plants at maharana pratap khel gaon for 1-year (2026-2027) 2811

Plantation and maintenance of plants at maharana pratap khel gaon for 1-year (2026-2027) 2811

Read more
Appointment of an agency for conceptualizing and conducting heritage walk at brihanmumbai municipal corporation (bmc) headquarters

Appointment of an agency for conceptualizing and conducting heritage walk at brihanmumbai municipal corporation (bmc) headquarters

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise