Tender Details
Particulars | Details |
---|---|
Title |
Cleaning And Repairing Work Of Existing Drain From Mdm Gate 4 To Issaiyo Ka Kabristan Main Storm Water Drain
|
Description |
Cleaning And Repairing Work Of Existing Drain From Mdm Gate 4 To Issaiyo Ka Kabristan Main Storm Water Drain
|
Organisation | DLB | State Govt. and UT |
Tender Id | 2025_DLB_449027_4 |
Reference Number |
NIT NO. 4256 DATE 17/02/2025 |
Tender Fee | 1000 |
EMD | 60000 |
Tender Value | |
Place | NAGAR NIGAM JODHPUR SOUTH |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=806316 |
Start Date | February 20, 2025 23:30 |
End Date |
10/03/2025 ( Expired 43 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreIt addl. pune infotech park i industrial
Construction of 6 lane road using cement&#x0d concrete treatment with footpath and storm water pipeline&#x0d repairing and providing new curbing at center verge and&#x0d road furnitures from shivaji chowk to smashan bhumi&#x0d
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreConsultancy services for authoritys engineer for supervision of widening/improvement of existing road to nhdl specifications of road changwinti walong namti from km 0.000 to km 54.450 and hayuliang-changwinti between km 45.050 to km 50.820
Consultancy services for authoritys engineer for supervision of widening/improvement of existing road to nhdl specifications of road changwinti walong namti from km 0.000 to km 54.450 and hayuliang-changwinti between km 45.050 to km 50.820
Read moreRehabilitaion and up gradation of existing km. 98.750 design ch 121.500 to existing km 83.690 design ch 136.500 and from existing km 78.050 design ch 161.281 to pimpalgaon baswant existing km 59.100 design ch. 161.281 to two lane with paved shoulders
Rehabilitaion and up gradation of existing km. 98.750 design ch 121.500 to existing km 83.690 design ch 136.500 and from existing km 78.050 design ch 161.281 to pimpalgaon baswant existing km 59.100 design ch. 161.281 to two lane with paved shoulders
Read moreOutsourcing maintennace at ph-1 to ph-4 of mukerian hydel project pspcl talwara punjab
Outsourcing the work of routine, prive maintenance, breakdown maintenance and annual overhauling of generating units, switchyards and other allied equipment through contractor at ph 1 to 4 of mukerian hydel project pspcl talwara pb
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreRoad widening and construction work of gaddi adda chouraha to badi puliya marg via v.d. cloth market, nikas chouraha, khajoor wali masjid, k.d. gate and juna somwariya
Road widening and construction work of gaddi adda chouraha to badi puliya marg via v.d. cloth market, nikas chouraha, khajoor wali masjid, k.d. gate and juna somwariya
Read moreConstruction of drain and covering from badeveer neta house to river side, chhattar to khimma jatav, jamman panda to kishan jatav, dhanraj to gendalal, jagdish panda to kallu vanshkar in mata ward, nagar palika parishad, gadarwara
Construction of drain and covering from badeveer neta house to river side, chhattar to khimma jatav, jamman panda to kishan jatav, dhanraj to gendalal, jagdish panda to kallu vanshkar in mata ward, nagar palika parishad, gadarwara
Read moreof your Industry type