Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏢 Procurement Opportunity: Air Conditioning System Installation For Metro Railway Kolkata 🌡️🛫 The Ministry Of Railways, Specifically The Central Govt. Ministry/Department, Is Seeking A Comprehensive Solution Provider For The Design, Supply, Installation, Testing, And Commissioning Of An Air Conditioning System For The Non Airconditioned Areas On Floors 1 Through 10 Of Metro Bhawan, Kolkata, For The Metro Railway Kolkata. 📅 Submission Deadline: June 14, 2024, 3:00 Pm A Tender Fee Of Inr 309,700 Is Applicable As Emd. Interested Bidders Must Submit Detailed Proposals, Including Design Specifications, Cost Estimates, And Maintenance Plans Post Warranty. Proposals Should Be In Accordance With The Tender Document For Comprehensive Evaluation. Keywords: Air Conditioning System, Installation, Metro Railway Kolkata, Ministry Of Railways, Central Govt. Ministry/Department, Tender, Maintenance| Particulars | Details |
|---|---|
| Title |
Design, Supply, Installation, Testing &Amp Commissioning Of Air Conditioning System In Non Airconditioned Area At Different Floors (1st Floor To 10th Floor) Of Metro Bhawan Of Metro Railway Kolkata Along With All Inclusive Maintenance After Expiry Of Warranty Period.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 75058444 |
|
Reference Number |
ELM_119_VRF_CMC_DT10-5-24 |
| Tender Fee | 0 |
| EMD | 3.1 Lakh |
| Tender Value | - |
| Place | Kolkata |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/062024/75058444/viewNitPdf_4566664.pdf |
| Start Date | May 17, 2024 21:57 |
| End Date |
Expired
14/06/2024
Expired 852 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
64 channel nvr, 8bay, sqtc,5 mp ptz camera, sqtc,5 mp ir bullet camera, mfz, sqtc,5 mp dome camera, mfz, sqtc,1 kva ups on line with 30 backup,55 inch led tv,sfp modules,giga 24 port switch poe,giga 28 port switch poe with sfp port,giga 16 port switch poe,giga 8 pluse 2 port switch poe,8tb surveillance hd,ofc 12 core armoured outdoor- mtrs,cat 6 utp cable 4 pair armoured,pwer cable copper armoired 1.5srmm,rack 6u wall mount, with accessories,rack 17u floor with accessories,6 port liu,24 port liu loaded,hdpe pipe in mtrs 40mm outer dia with accessories,fiber accessories pigtail with sc-lc, jack pannel,cat 6 patch cord,2 feet digging,gi pipe 20 feet,branded, pc desktop i5,8gb ram,1 tb hdd, kbd, mouse, graphics card,unified threat management firewall,installations and commissioning,amc cost for next 3 yrs after 2 year warranty.
64 channel nvr, 8bay, sqtc,5 mp ptz camera, sqtc,5 mp ir bullet camera, mfz, sqtc,5 mp dome camera, mfz, sqtc,1 kva ups on line with 30 backup,55 inch led tv,sfp modules,giga 24 port switch poe,giga 28 port switch poe with sfp port,giga 16 port switch poe,giga 8 pluse 2 port switch poe,8tb surveillance hd,ofc 12 core armoured outdoor- mtrs,cat 6 utp cable 4 pair armoured,pwer cable copper armoired 1.5srmm,rack 6u wall mount, with accessories,rack 17u floor with accessories,6 port liu,24 port liu loaded,hdpe pipe in mtrs 40mm outer dia with accessories,fiber accessories pigtail with sc-lc, jack pannel,cat 6 patch cord,2 feet digging,gi pipe 20 feet,branded, pc desktop i5,8gb ram,1 tb hdd, kbd, mouse, graphics card,unified threat management firewall,installations and commissioning,amc cost for next 3 yrs after 2 year warranty.
Read moreCr system,cmc after expiry of 5 years warranty period 1st year,cmc after expiry of 5 years warranty
Read more
Design, supply, installation, testing & commissioning of air conditioning system in new floors(11th to 14th) along with all-inclusive maintenance after expiry of warranty period at metro railway bhawan in metro railway kolkata.
For complete deion and other details, please refer to tender
Read moreIabp machine,cmc after expiry of 5 years warranty period 1st year,cmc after expiry of 5 years warra
Read more
Iabp machine,cmc after expiry of 5 years warranty period 1st year,cmc after expiry of 5 years warra
Read more
Blood storage refrigerator,cmc 1st year after warranty of 05 years,cmc 2nd year after expiry of 1st
Read more
Sterile connecting device,cmc 1st year after warranty of 05 years,cmc 2nd year after expiry of 1st
Read more
Sterile connecting device,cmc 1st year after warranty of 05 years,cmc 2nd year after expiry of 1st
Read more
of your Industry type