Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🛣️ Invitation For Bids: Bhimashankar Talegaghar Wada Rajgurunagar Road Project 🛣️ The Ministry Of Road Transport And Highways, Central Government, Invites Bids From Eligible Contractors For The Widening, Reconstruction, And Up Gradation To 2 Pls Configuration Of The Bhimashankar Talegaghar Wada Rajgurunagar Road On The Hybrid Annuity Model (Ham). 📅 Bid Submission Deadline: April 23, 2024, 5:00 Pm The Project Is Located In The Bhimashankar Area And Involves Significant Infrastructure Development. Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 700 Million And Adhere To The Tender Guidelines And Specifications. Keywords: Infrastructure, Road Widening, Reconstruction, Up Gradation, 2 Pls, Hybrid Annuity Model, Ministry Of Road Transport And Highways, Bhimashankar, Government Tender| Particulars | Details |
|---|---|
| Title |
Widening, Reconstruction And Up Gradation To 2 Pls Configuration For The Work Of Bhimashankar Talegaghar Wada Rajgurunagar Road On Ham.
|
| Description |
Widening, Reconstruction And Up Gradation To 2 Pls Configuration For The Work Of Bhimashankar Talegaghar Wada Rajgurunagar Road On Ham.
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_799749_1 |
|
Reference Number |
RO/MUM/TENDER/2023-24/08 |
| Tender Fee | 0 |
| EMD | 7 Crore |
| Tender Value | - |
| Place | Bhimashankar |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=840669 |
| Start Date | April 15, 2024 14:30 |
| End Date |
Expired
23/04/2024
Expired 904 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Reconstruction work for the widening of the bridge located on the road gt road km 247 to junhesa road km1
Reconstruction work for the widening of the bridge located on the road gt road km 247 to junhesa road km1
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreWidening to 4l ps configuration from km 6.600 to 16.300 of the khamgaon to shegaon section of n h 548c in the state of maharashtra on epc mode
Widening to 4l ps configuration from km 6.600 to 16.300 of the khamgaon to shegaon section of n h 548c in the state of maharashtra on epc mode
Read moreWidening and strengthening/reconstruction work of kherabani (sh-15)-ranighaghar (adb) road (total length-9.172 km) under road division dumka for the year 2026-27.
Widening and strengthening/reconstruction work of kherabani (sh-15)-ranighaghar (adb) road (total length-9.172 km) under road division dumka for the year 2026-27.
Read moreWidening and strengthening/reconstruction work of sardiha to belguma via chamrabahiyar school road (total length-2.816 km) under road division dumka for the year 2026-27
Widening and strengthening/reconstruction work of sardiha to belguma via chamrabahiyar school road (total length-2.816 km) under road division dumka for the year 2026-27
Read moreWidening and strengthening/reconstruction work of barganda chowk to college more via power house road (length - 2.715 km.) for the year 2026-27 under road division, giridih
Widening and strengthening/reconstruction work of barganda chowk to college more via power house road (length - 2.715 km.) for the year 2026-27 under road division, giridih
Read moreBalance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for proper
Balance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for
Read moreWidening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh
Widening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh
Read moreWidening re-construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Widening re-construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreof your Industry type