Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Sitc Of Hml And Mml System At 21 Locations In Kondotty Lac Under The Mla Ads 2023 24 Of Sri T V Ibrahim Mla With 3 Years Of Warranty
|
Description |
Sitc Of Hml And Mml System At 21 Locations In Kondotty Lac Under The Mla Ads 2023 24 Of Sri T V Ibrahim Mla With 3 Years Of Warranty
|
Organisation | Kerala Electrical and Allied Engineering Co. Ltd | State Govt. and UT |
Tender Id | 2025_KEL_763746_1 |
Reference Number |
KEL/FL/MMD/K09/EPROC/25-26 |
Tender Fee | 5000 |
EMD | 24000 |
Tender Value | |
Place | Kondotty LAC |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1243892 |
Start Date | May 09, 2025 16:30 |
End Date |
16/05/2025 ( Expired 51 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of hl bridge (3 span 11.00 m each eff) on khalchian drain in village kang on khadoor sahib tarn taran road at rd 9300 mtr including approaches and di package on pb-22-015-a under pmgsy iii batch ii for the year 2023-24 scheme
Construction of hl bridge (3 span 11.00 m each eff) on khalchian drain in village kang on khadoor sahib tarn taran road at rd 9300 mtr including approaches and di package on pb-22-015-a under pmgsy iii batch ii for the year 2023-24 scheme
Read moreSitc and guaranteeing the performance of 59 nos. non inverter type 2.0 tr capacity 3 star rated split type ac plants at various location in chennai port authority with 4 years camc
Sitc and guaranteeing the performance of 59 nos. non inverter type 2.0 tr capacity 3 star rated split type ac plants at various location in chennai port authority with 4 years camc
Read moreUpgradation of northern byepass patiala rd 0.00 t0 4.73 kms 4.73km in patiala under head 5054 rb-10 year 2023-24 with 5 years routine maintenance after completion of work 2nd year to 5th year 1st year will be considered as defect liability period
Upgradation of northern byepass patiala rd 0.00 t0 4.73 kms 4.73km in patiala under head 5054 rb-10 year 2023-24 with 5 years routine maintenance after completion of work 2nd year to 5th year 1st year will be considered as defect liability period
Read moreUpgradation of patiala-sanour road rd-3.60 t0 7.60 kms 4.00km in patiala under head 5054 rb-10 year 2023-24 with 5 years routine maintenance after completion of work 2nd year to 5th year 1st year will be considered as defect liability period
Upgradation of patiala-sanour road rd-3.60 t0 7.60 kms 4.00km in patiala under head 5054 rb-10 year 2023-24 with 5 years routine maintenance after completion of work 2nd year to 5th year 1st year will be considered as defect liability period
Read moreSitc of designed based public address pa system at aurangabad airport with 3 years onsite warranty and 5 years post warranty comprehensive annual maintenance contract with spares
Sitc of designed based public address pa system at aurangabad airport with 3 years onsite warranty and 5 years post warranty comprehensive annual maintenance contract with spares
Read moreE tender for dismantling, design, manufacture, sitc and handing over of 1 no. 26 persons capacity bed-cum passenger lift at main hospital with 3 years camc after one year guarantee period in chpa
E tender for dismantling, design, manufacture, sitc and handing over of 1 no. 26 persons capacity bed-cum passenger lift at main hospital with 3 years camc after one year guarantee period in chpa
Read moreSpecial repair of various link road in market committee mukerian under special repair for the year 2022 23 2023 24 and 2024 25 in distt hoshiarpur including maintenance of road for 5 years one year defect liability period plus four years maint gn 3
Special repair of various link road in market committee mukerian under special repair for the year 2022 23 2023 24 and 2024 25 in distt hoshiarpur including maintenance of road for 5 years one year defect liability period plus four years maint gn 3
Read moreBudgetary quotation for recapitalization of remote control and monitoring system with 03 years warranty and 07 years post camc under sri vijaya puram directorate
Budgetary quotation for recapitalization of remote control and monitoring system with 03 years warranty and 07 years post camc under sri vijaya puram directorate
Read moreConstruction of (8 works) open gyms (i) soujanya colony, ward no. 1, ii. gun rock enclave, ward no. 3 (iii). ravi chs, mahendra hills, ward no. 5 (iv).indrapuri railway colony park, ward no. 5 (v). durgavihar colony park, ward no. 7 (vi). mahatma gandhi community hall, ward no. 7 (vii). sneha colony park, ward no.08 (viii). open gym in doveton bazar (garden no. 95, 30-1409), ward no.08 in cantonment assembly constituency under sdf 2023-24 proposed by hon ble mla cantonment assembly
Construction of (8 works) open gyms (i) soujanya colony, ward no. 1, ii. gun rock enclave, ward no. 3 (iii). ravi chs, mahendra hills, ward no. 5 (iv). indrapuri railway colony park, ward no. 5 (v). durgavihar colony park, ward no. 7 (vi). mahatma gandhi community hall, ward no. 7 (vii). sneha colony park, ward no.08 (viii). open gym in doveton bazar (garden no. 95, 30-1409), ward no.08 in cantonment assembly constituency under sdf 2023-24 proposed by hon ble mla cantonment assembly
Read moreLaying of vdcc road at puranaphool-2 and h.no.21-2-878/a to h.no.21-2-877/b. charminar assembly constituency.proposed by hon ble mla charminar assembly constituency under sdf- 2023-24
Laying of vdcc road at puranaphool-2 and h.no.21-2-878/a to h.no.21-2-877/b. charminar assembly constituency.proposed by hon ble mla charminar assembly constituency under sdf- 2023-24
Read moreof your Industry type