Periodical Shifting Of Intermediate Pump, Ers, Cables And Extension Of Suction Pipe In 96 D Cm Panel, And 90 Lw Panel And Transportation Of Motor, Er And Ht Pumps Main Dip In V Top Seam At Baherabandh U.G. Mine Of Hasdeo Area.
Description
Periodical Shifting Of Intermediate Pump, Ers, Cables And Extension Of Suction Pipe In 96 D Cm Panel, And 90 Lw Panel And Transportation Of Motor, Er And Ht Pumps Main Dip In V Top Seam At Baherabandh U.G. Mine Of Hasdeo Area.
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_SECL_323299_1
Reference
Number
AGM/HSD/SO(M)/e-Tend/24-25/112 dtd 14.12.2024
Tender Fee 0
EMD 54100
Tender Value
Place SECL Hasdeo Area
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=335120
Start Date December 14, 2024 15:30
End Date

28/12/2024 ( Expired 115 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Installation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla

Installation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla

Read more
Installation of new stone barrier in 90lw lhd development distt in v top seam at baherabandh ug mine of hasdeo area.

Installation of new stone barrier in 90lw lhd development distt in v top seam at baherabandh ug mine of hasdeo area.

Read more
Shifting of face pump and laying of pipe line for dewatering of working faces in 34 ln panel of seam a at kurja ug mine of hasdeo area for six month period.

Shifting of face pump and laying of pipe line for dewatering of working faces in 34 ln panel of seam a at kurja ug mine of hasdeo area for six month period.

Read more
Loading, transportation and unloading of new dismantling and shortening of 800mm belt with drive head and structure complete with electricals from e9lhd depillaring panel to e8/main dip panel of bagdona seam at tawa mine of pathakhera area.

Loading, transportation and unloading of new dismantling and shortening of 800mm belt with drive head and structure complete with electricals from e9lhd depillaring panel to e8/main dip panel of bagdona seam at tawa mine of pathakhera area.

Read more
Construction of 48 nos rcc ventilation stoppings and repairing of 19 nos. of old ventilation stoppings in vi top seam for prop. cm depillaring panel c1 and c2 at bangwar ug mine

Construction of 48 nos rcc ventilation stoppings and repairing of 19 nos. of old ventilation stoppings in vi top seam for prop. cm depillaring panel c1 and c2 at bangwar ug mine

Read more
Transportation and placement of vcb, tsu, cables, and acbs for 49d substation on civil foundation in between 0l and 2l in r v seam for cm 1 section in mic jpc

Transportation and placement of vcb, tsu, cables, and acbs for 49d substation on civil foundation in between 0l and 2l in r v seam for cm 1 section in mic jpc

Read more
Transportation and installation of 01 no. 1000 gpm ht pump and 01 no. 500 gpm lt pump, with all accessory (motor, er, power cable and laying 6 inch dia. pipe line) in iv-b seam at piparia colliery (ug mine), umaria sub area, johilla area

Transportation and installation of 01 no. 1000 gpm ht pump and 01 no. 500 gpm lt pump, with all accessory (motor, er, power cable and laying 6 inch dia. pipe line) in iv-b seam at piparia colliery (ug mine), umaria sub area, johilla area

Read more
Construction of 80 nos. new fly ash ventilation stopping for the proposed cm development panel no. 55lw, 50lw, 45lw and 38l at v- top seam of baherabandh u g mine of hasdeo area

Construction of 80 nos. new fly ash ventilation stopping for the proposed cm development panel no. 55lw, 50lw, 45lw and 38l at v- top seam of baherabandh u g mine of hasdeo area

Read more
Construction of (i) 22 nos rcc sectionalization stoppings to sectionalize 55lw,50lw,45lw, 38lw proposed cm panel and (ii) construction of 12 nos. rcc retaining walls in 55lw,50lw,45lw , 38lw proposed cm panel in v top seam of baherabandh ug mine of

Construction of (i) 22 nos rcc sectionalization stoppings to sectionalize 55lw,50lw,45lw, 38lw proposed cm panel and &#x0d (ii) construction of 12 nos. rcc retaining walls in 55lw,50lw,45lw , 38lw proposed cm panel in v top seam of baherabandh ug mine of

Read more
Shifting of gate and box, drill panels, drill machines and support of cables within the district for 4j-6b and 4j-7b depillaring panel of 4a seam at jhiria ug mine

Shifting of gate and box, drill panels, drill machines and support of cables within the district for 4j-6b and 4j-7b depillaring panel of 4a seam at jhiria ug mine