Tender Details

Particulars Details
Title
Installation Of New Stone Barrier In 90 Lw Lhd Development Distt In V Top Seam At Baherabandh Ug Mine Of Hasdeo Area.
Description
Installation Of New Stone Barrier In 90 Lw Lhd Development Distt In V Top Seam At Baherabandh Ug Mine Of Hasdeo Area.
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_SECL_331612_1
Reference
Number
AGM/HSD/SO(M)/e-Tend/24-25/161 dtd 07.03.2025
Tender Fee 0
EMD 39500
Tender Value
Place SECL Hasdeo Area
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343756
Start Date March 07, 2025 23:30
End Date

19/03/2025 ( Expired 86 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.

Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.

Read more
Essential repair to b/r nature of works at hq dgbr complex seema sadak bhawan ring road delhi cantt in the area of 1353 ge 21 brtf under project shivalik in new delhi

Essential repair to b/r nature of works at hq dgbr complex seema sadak bhawan ring road delhi cantt in the area of 1353 ge 21 brtf under project shivalik in new delhi

Read more
Periodical services of certain buildings of hq dgbr and otm complex at hq dgbr (seema sadak bhawan), ring road, delhi cantt in the area of 1353 ge /21 brtf under project shivalik in new delhi

Periodical services of certain buildings of hq dgbr and otm complex at hq dgbr (seema sadak bhawan), ring road, delhi cantt in the area of 1353 ge /21 brtf under project shivalik in new delhi

Read more
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

Read more
Installation and operating of 10 m.t. weighing bridge under bot scheme

Installation and operating of 10 m.t. weighing bridge under bot scheme at new mandi yard ashoknager distt. ashoknager

Read more
Ash dyke area for controlled movement of heavy vehicle at ntpc sipat

Construction of new ramp in ash dyke area for controlled movement ofheavy vehicle at ntpc sipat

Read more
Supplying laying and spreading of crushed stone over a layer of cement,sand,and brick khoa mix and other associated works at lv side portion switchyard of 3rd 31.5 mva transformer at new bishnupur 220 kv substation under bankura area office,wbsetcl

Supplying laying and spreading of crushed stone over a layer of cement,sand,and brick khoa mix and other associated works at lv side portion switchyard of 3rd 31.5 mva transformer at new bishnupur 220 kv substation under bankura area office,wbsetcl

Read more
Wbnkda/06/ee-pand gv/nkda of 2025-26 ( sl no 2)

Maintenance of arboriculture underneath of flyover in between axis mall and clock tower at action area -i new town kolkata for 02 years).

Read more
Installation of new 100 kva transformer at koteshwar dham in nagar parishad, lanji

Installation of new 100 kva transformer at koteshwar dham in nagar parishad, lanji

Read more
Supply, installation, testing and trial for replacement of old 415 v lt power distribution panels installed for mains, dg power supply in b1 b2 c and d blocks and 415 v lt main panel installed in substation with new one in the cmpdi ri-7 colony

Supply, installation, testing and trial for replacement of old 415 v lt power distribution panels installed for mains, dg power supply in b1 b2 c and d blocks and 415 v lt main panel installed in substation with new one in the cmpdi ri-7 colony

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise