Tender Details

Particulars Details
Title
Construction Of 12 Nos Rcc Sectionalisation Stoppings To Isolate 90 Lw Lhd Panel 96 Dip Cm Panel(ii) Construction Of 02 Nos.Rcc Retaining Wall And 02 Nos. Rcc Protective Pillars In 90 Lw Lhd Panel In V Top Seam Of Baherabandh Ug Mine Of Hasdeo Area.
Description
Construction Of 12 Nos Rcc Sectionalisation Stoppings To Isolate 90 Lw Lhd Panel 96 Dip Cm Panel(ii) Construction Of 02 Nos.Rcc Retaining Wall And 02 Nos. Rcc Protective Pillars In 90 Lw Lhd Panel In V Top Seam Of Baherabandh Ug Mine Of Hasdeo Area.
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_SECL_320274_1
Reference
Number
AGM/HSD/GM(O)/e-Tend/24-25/99 dtd 30.10.2024
Tender Fee 0
EMD 50900
Tender Value
Place SECL Hasdeo Area
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=331994
Start Date October 30, 2024 23:30
End Date

12/11/2024 ( Expired 187 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 5 nos. rcc sectionlization stopping in vi bottom seam at bangwar ug mine

Construction of 5 nos. rcc sectionlization stopping in vi bottom seam at bangwar ug mine

Read more
Proposal for construction of 20 nos. r.c.c. sectionalization 20 nos rcc isolation stoppings in panel b28 b29 b30 b31 b3 b4 b5 b37 b36 in seam vib at khairaha u g mine

Proposal for construction of 20 nos. r.c.c. sectionalization 20 nos rcc isolation stoppings in panel b28 b29 b30 b31 b3 b4 b5 b37 b36 in seam vib at khairaha u g mine

Read more
Construction of 09(nine) nos. of sectionalisation stoppings in satgram (r-v) seam at no.4 pit of chapui khas colliery

Construction of 09(nine) nos. of sectionalisation stoppings in satgram (r-v) seam at no.4 pit of chapui khas colliery

Read more
Work of construction of two nos. retaining wall against sump 1md 44lw and 55l 5md in benti block (lower bachra seam) at churi ug colliery

Work of construction of two nos. retaining wall against sump 1md 44lw and 55l 5md in benti block (lower bachra seam) at churi ug colliery

Read more
Reconstruction of 6 nos. isolation stoppings by rcc and replaster of 50 no. old isolation stoppings in depillared panels of seam ii and cleaning of fallen coal in old galleries at naheriya underground mine of pench area

Reconstruction of 6 nos. isolation stoppings by rcc and replaster of 50 no. old isolation stoppings in depillared panels of seam ii and cleaning of fallen coal in old galleries at naheriya underground mine of pench area

Read more
Work for construction of 23 nos ventilation stopping between 45n and 46n from 12e to 19e and between 40n and 41n from 12e to 26e for proposed panel no cm2 and cm3 in no v seam of ncph colliery r-6 mine

Work for construction of 23 nos ventilation stopping between 45n and 46n from 12e to 19e and between 40n and 41n from 12e to 26e for proposed panel no cm2 and cm3 in no v seam of ncph colliery r-6 mine

Read more
Construction of 15 nos (fifteen) isolation stoppings to isolate the proposed panels pb 3 and pb 4 in rviib seam of cm project under nakrakonda kumardihi b colliery.

Construction of 15 nos (fifteen) isolation stoppings to isolate the proposed panels pb 3 and pb 4 in rviib seam of cm project under nakrakonda kumardihi b colliery.

Read more
Construction of 43 nos. of rcc sectionalisation stoppings (26 nos. rcc sectionalisation preparatory stoppings and 17 nos. rcc sectionalisation stoppings) in seam iv (b) and seam iv (m) and seam v of saoner mine no. 2, nagpur area

Construction of 43 nos. of rcc sectionalisation stoppings (26 nos. rcc sectionalisation preparatory stoppings and 17 nos. rcc sectionalisation stoppings) in seam iv (b) and seam iv (m) and seam v of saoner mine no. 2, nagpur area

Read more
Construction of 30 nos rcc isolation stoppings and 4 nos brick made isolation stopping at 11dip proposed depillaring panel in massan combined seam of shiwani ug mine.

Construction of 30 nos rcc isolation stoppings and 4 nos brick made isolation stopping at 11dip proposed depillaring panel in massan combined seam of shiwani ug mine.

Read more
Providing of 150 nos of subsidence monitoring pillars before for taking initial levelling, after subsidence and cutting of garland 1920.0 mtr drain around in proposed depillaring panel i.e. 40le panel in mk (top) seam.

Providing of 150 nos of subsidence monitoring pillars before for taking initial levelling, after subsidence and cutting of garland 1920.0 mtr drain around in proposed depillaring panel i.e. 40le panel in mk (top) seam.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise