Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Purchase Of Eddy Covariance System Package
|
| Description |
As Per Tender Document
|
| Organisation | Department of Higher Education | Central Govt. Ministry/Department |
| Tender Id | 2023_DoHE_737624_1 |
|
Reference Number |
IIT/AG/ASM/IoE/DKS/2023-24/01 |
| Tender Fee | 0 |
| EMD | 1.5 Lakh |
| Tender Value | |
| Place | IIT Kharagpur |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1040524 |
| Start Date | December 13, 2023 15:30 |
| End Date |
Expired
09/01/2024
Expired 908 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of carbon brush for eddy current clutch gear unit to s.rly drg no. sr/d/bs-50/bm
For complete deion and other details, please refer to tender
Read morePurchase of wi-fi access devices
Purchase of wifi access devices -30 nos for cse department
Read moreTender for purchase of nozzle plate of fibrizer turbine.
Tender for purchase of nozzle plate of fibrizer turbine.
Read moreRe-conductoring package oh01 (ratle)
Re-conductoring package oh01 associated with transmission scheme for evacuation of power from ratle hep (850 mw) and kiru hep (624 mw): part-b.
Read moreDevelopment, maintenance, management and operation of greenfield high-speed corridor from mawlyngkhung (near shillong) in meghalaya to panchgram (near silchar) in assam by 4-laning with paved shoulders on hybrid annuity basis. (package-3)
Read moreTender for purchase of membrane for r.o plant make dow/dupont
Tender for purchase of membrane for r.o plant make dow/dupont
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreSupply and installation of femtosecond laser system.
Supply and installation of femtosecond laser system.
Read moreSupply installation testing commissioning of multi modal imaging system
Multi modal imaging system with confocal and flim capability
Read moreProvision of main drainage system at jnv palamu-ii (jharkhand)
Provision of main drainage system at jnv palamu-ii (jharkhand)
Read moreof your Industry type