Tender Details

About Tender

🏗️ Construction Opportunity: Rub/Subway Project 🚇🛠️ The Ministry Of Railways, Central Government, Invites Tenders For The Construction Of A Road Under Bridge (Rub)/Subway To Eliminate Manned Level Crossings At Ka 72 Between Bishnupur Ondagram On The Bankura Kharagpur Section In Adra Division, Kolkata. 📅 Submission Deadline: April 12, 2024, 3:00 Pm The Project Will Be Executed Using The Cut & Cover Method. Interested Contractors Must Submit A Tender Security Of Inr 484,000. Detailed Tender Documents Are Available For Review, And Interested Parties Should Submit Their Bids In Accordance With The Specifications And Guidelines Provided. Keywords: Construction, Rub/Subway, Manned Level Crossing Elimination, Ministry Of Railways, Infrastructure Project, Tender, Emd, Adra Division, Kolkata
Particulars Details
Title
Construction Of Rub/ Subway For Elimination Of Manned Level Crossings Ka 72 At Km 214.058 In Between Bishnupur Ondagram By Cut &Amp Cover Method Of Bankura Kharagpur Section In Adra Division.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 73998576
Reference
Number
E-DRM-Engg-ADRA-34-24
Tender Fee 0
EMD 4.84 Lakh
Tender Value
Place Kolkata
Link https://www.ireps.gov.in/ireps/works/pdfdocs/042024/73998576/viewNitPdf_4502765.pdf
Start Date March 21, 2024 19:04
End Date

12/04/2024 ( Expired 375 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode

Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode

Read more
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode

Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode

Read more
Construction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode

Construction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode

Read more
Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway

Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway

Read more
Repair and re construction work of jamak canal damaged by the under construction kamar motor road of pmgsy division uttarkashi in bhatwadi block distt-uttarkashi (reach -0.00 km to 1.000 km)

Repair and re construction work of&amp#x0d jamak canal damaged by the under&amp#x0d construction kamar motor road of&amp#x0d pmgsy division uttarkashi in&amp#x0d bhatwadi block distt-uttarkashi&amp#x0d (reach -0.00 km to 1.000 km)

Read more
Construction of limited height subway/rub near proposed rob at railway km 576/10-11 (lc no.-c61) on nh-89 (old nh) at ch. 165/550 (left out portion of nagaur-bikaner section) in the state of rajasthan on epc mode.

Construction of limited height subway/rub near proposed rob at railway km 576/10-11 (lc no.-c61) on nh-89 (old nh) at ch. 165/550 (left out portion of nagaur-bikaner section) in the state of rajasthan on epc mode.

Read more
Construction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode

Construction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise