Tender Details
About Tender
🏗️ Construction Opportunity: Rub/Subway Project For Manned Level Crossing Elimination 🚆🛠️ The Ministry Of Railways, Central Government, Invites Tenders From Experienced Contractors For The Construction Of A Road Under Bridge (Rub)/Subway To Eliminate Manned Level Crossings At Km 170.465 On The Bqa Kgp Section In Adra Division, Kolkata. 📅 Submission Deadline: April 30, 2024, 3:00 Pm A Tender Security Amounting To Inr 484,000/ Is Required. Interested Bidders Should Review The Complete Tender Document For Detailed Project Specifications, Scope, And Submission Guidelines. Keywords: Construction, Rub/Subway, Manned Level Crossing Elimination, Ministry Of Railways, Central Government, Tender, Bid, Adra Division, KolkataParticulars | Details |
---|---|
Title |
Construction Of Rub/ Subway For Elimination Of Manned Level Crossings Ka 42 At Km 170.465 In Between Cdgr Gba By Cut &Amp Cover Method Of Bqa Kgp Section In Adra Division.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 74285587 |
Reference Number |
E-DRM-Engg-ADRA-47-24 |
Tender Fee | 0 |
EMD | 4.84 Lakh |
Tender Value | |
Place | Kolkata |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/042024/74285587/viewNitPdf_4518850.pdf |
Start Date | April 09, 2024 01:11 |
End Date |
30/04/2024 ( Expired 357 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreConstruction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Construction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Read moreConstruction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Read moreRepair and re construction work of jamak canal damaged by the under construction kamar motor road of pmgsy division uttarkashi in bhatwadi block distt-uttarkashi (reach -0.00 km to 1.000 km)
Repair and re construction work of&#x0d jamak canal damaged by the under&#x0d construction kamar motor road of&#x0d pmgsy division uttarkashi in&#x0d bhatwadi block distt-uttarkashi&#x0d (reach -0.00 km to 1.000 km)
Read moreConstruction of limited height subway/rub near proposed rob at railway km 576/10-11 (lc no.-c61) on nh-89 (old nh) at ch. 165/550 (left out portion of nagaur-bikaner section) in the state of rajasthan on epc mode.
Construction of limited height subway/rub near proposed rob at railway km 576/10-11 (lc no.-c61) on nh-89 (old nh) at ch. 165/550 (left out portion of nagaur-bikaner section) in the state of rajasthan on epc mode.
Read moreProvision of water level monitoring system on bridge no 284 at km 227/23-37 between kgp-bqa section on dwarkeshwar river in adra division of s.e.railway with amc for 3 years.
For complete deion and other details, please refer to tender
Read moreExecution of signaling & telecommunication work in connection with: (1) bilaspur-durg: bilaspur - durg ctr(s) - 13.393 tkm & raipur - lakholi - ctr(s) - 18.659 tkm., (2) bilaspur-durg-ttr(cmsc)- 37 sets, ttr (tws)- 21 set & ttr (cs) - 41 sets, (3) construction of rub (fhs) at km 734/33-735/35a in lieu of manned level crossing no. 373 (belha yard) at km 734/25-27 between belha-dagori section in howrah-mumbai main line on cost sharing basis, (4) construction of rub in lieu of lc no.
For complete deion and other details, please refer to tender
Read moreConstruction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Construction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Read moreExecution of electrical (gen.) portion of work for construction of rub at km.824/41-43 in lieu of manned level crossing no.415 between urk-szb section in howrah - mumbai main line.
For complete deion and other details, please refer to tender
Read moreof your Industry type