Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling Of Rcc Structure,Excavation Ordinary Soil Upto 1.5 M,Filling Sand,Pcc 1 3 6,Foundn Rcc
|
| Description |
|
| Organisation | Bharat Petroleum Corporation Ltd | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2025/B/6526379 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | August 02, 2025 16:51 |
| End Date |
Expired
16/08/2025
Expired 423 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
ANANTH RESIDENCYANANTH RESIDENCYANANTH RESIDENCYANANTH RESIDENCYANANTH RESIDENCY...
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 1 | ₹ 10692.000 |
| bncncm | HOLYMEN | vmvmv | 10 | ₹ 288.000 |
| Test item reject | asdf-brand | Test item reject | 1000 | ₹ 49000.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 1 | ₹ 10692.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 1 | ₹ 9.900 |
| bncncm | HOLYMEN | vmvmv | 20 | ₹ 576.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 20 | ₹ 80.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 2 | ₹ 21384.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 11 | ₹ 44.000 |
| BASKETBALL RING | vixen | 460 | 1 | ₹ 999.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 2 | ₹ 990.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 1 | ₹ 10692.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 1 | ₹ 10692.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 1 | ₹ 10692.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 1 | ₹ 10692.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 2 | ₹ 1100.000 |
| BASKETBALL RING | vixen | 460 | 1 | ₹ 999.000 |
| Dell Vostro 3268 SFF - PDC G4560-4GB-1TB-NO DVD-18.5" -Linux - 3Y - WIFI - BT | Dell | Dell Vostro 3268 SFF - PDC G4560-4GB-1TB-NO DVD-18.5"-Linux - 3Y | 1 | ₹ 27040.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 11 | ₹ 44.000 |
| bncncm | HOLYMEN | vmvmv | 15 | ₹ 432.000 |
Earth filling(replacement of existing soil upto 4m) for the archagar and staff quarters
Earth filling (replacement of existing soil upto 4m) for the archagar and staff quarters belong to arulmigu raveeswarar, temple,vyasarpadi, chennai
Read moreLayout and excavation work,earth filling and hard cementing work,vertical pole support as required for structure,ms trusses support as required for structure,ms purlins or rafters supports as required for structure,wall cladding,tin roofing,doors 7x 3 feet,window 4x4 feet,enamel paint of ms structure,electrical work as required,ceramic tiling work
Layout and excavation work,earth filling and hard cementing work,vertical pole support as required for structure,ms trusses support as required for structure,ms purlins or rafters supports as required for structure,wall cladding,tin roofing,doors 7x 3 feet,window 4x4 feet,enamel paint of ms structure,electrical work as required,ceramic tiling work
Read moreSupply of all materials, labour, t and p required for shifting of the 0.443 km existing trunk sewer line of 300 or 350 mm dia rcc np-3 pipe at vikramaditya marg, lucknow including, survey, investigation, dismantling and excavation of roads
Supply of all materials, labour, t and p required for shifting of the 0.443 km existing trunk sewer line of 300 or 350 mm dia rcc np-3 pipe at vikramaditya marg, lucknow including, survey, investigation, dismantling and excavation of roads
Read moreExcavation,excv rck dis out,excv hrd rck noblast,dismantl pcc,dismantl rcc,dismntl brick mason,availabl earth fill,ground surf dressing,shor 1.5-3m opn timb,brk flt surf 80 cl75,pcc,precast rcc,steel reinforcement,sfep str stl manual,fence brb wr,sf concertina 600mm,plaster,neat,pnt prm,painting of boundary wall - bld pnt snowcem 2c,fr scrn,pvr block,old paver block lay
Excavation,excv rck dis out,excv hrd rck noblast,dismantl pcc,dismantl rcc,dismntl brick mason,availabl earth fill,ground surf dressing,shor 1.5-3m opn timb,brk flt surf 80 cl75,pcc,precast rcc,steel reinforcement,sfep str stl manual,fence brb wr,sf concertina 600mm,plaster,neat,pnt prm,painting of boundary wall - bld pnt snowcem 2c,fr scrn,pvr block,old paver block lay
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreEarthwork excavation,sand filling,back filling,pcc,rcc sub structure,rcc super structure,shuttering
Read more
Site prepartion,soil excavation,ordinary soil excavation,hard rock,excavation of foundation,filling
Read more
of your Industry type