Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Jungle Cleaning,Earthwork Excavation,Filling,Pcc,Rcc Upto Foundation,Rcc Column,Rcc Beam,Brickwork,
|
| Description |
|
| Organisation | Department of Atomic Energy | PMO |
| Tender Id | GEM/2025/B/5812691 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | January 16, 2025 16:25 |
| End Date |
Expired
07/02/2025
Expired 614 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Renovation of un-utilized water bodies sh clearing of jungle and earthwork in bed excavation etc. at kathia baba gurukul seva trust ashram at dharmanagar sub-division
Renovation of un-utilized water bodies sh clearing of jungle and earthwork in bed excavation etc. at kathia baba gurukul seva trust ashram at dharmanagar sub-division
Read moreWork involves construction of a store building and septic tank, including earthwork, cc, rcc, brickwork, plastering, damp-proof course and reinforcement. all materials, including cement, ms bars and bricks, shall be supplied by the contractor.
Work involves construction of a store building and septic tank, including earthwork, cc, rcc, brickwork, plastering, damp-proof course and reinforcement. all materials, including cement, ms bars and bricks, shall be supplied by the contractor.
Read morePdg and lyg of pav wks comprising earthwork filling wbm wmm and bituminous surf wks with dbm50 mm 65 mm bc30 mm, prime and tcoat in strchs as per partic specn bet km148.0 to km164.3 and km168.97 to km172.8 on ldp rd under 71 rcc 24 tf pro psk in miz
Pdg and lyg of pav wks comprising earthwork filling wbm wmm and bituminous surf wks with dbm50 mm 65 mm bc30 mm, prime and tcoat in strchs as per partic specn bet km148.0 to km164.3 and km168.97 to km172.8 on ldp rd under 71 rcc 24 tf pro psk in miz
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreEarthwork in an excavation,filling in foundation,earthwork in filling,brick flat soling,plain cemen
Read more
Earthwork excavation,sand filling,back filling,pcc,rcc sub structure,rcc super structure,shuttering
Read more
Earthwork in excavation,supply and filling in foundation,providing and laying in position cement co
Read more
of your Industry type