Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Earthwork In An Excavation,Filling In Foundation,Earthwork In Filling,Brick Flat Soling,Plain Cemen
|
| Description |
|
| Organisation | Railways Public Sector Undertakings | Ministry of Railways |
| Tender Id | GEM/2024/B/5205097 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | July 25, 2024 18:36 |
| End Date |
Expired
05/08/2024
Expired 800 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Construction of cc road, construction of laying flat brick soling and construction of kitchen room (load bearing structure) at sri sri bholananda purushottam matrik ashram, agartala, west tripura
Construction of cc road, construction of laying flat brick soling and construction of kitchen room (load bearing structure) at sri sri bholananda purushottam matrik ashram, agartala, west tripura
Read moreDevelopment of different roads under the jurisdiction of pwd(r and b) jirania sub-division during the year 2026-27 sh repair to pot holes by shelmac, patch brick soling, placing of gunny bags, stripping of excess soil, surface drains, bats filling
Development of different roads under the jurisdiction of pwd(r and b) jirania sub-division during the year 2026-27 sh repair to pot holes by shelmac, patch brick soling, placing of gunny bags, stripping of excess soil, surface drains, bats filling
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreCasual renewal of psc sleepers on points and crossings as per tender,drilling of hole of different diameter and chamfering in rail as per tender,gas cutting of rail of various section as per tender,cutting cropping of rail of 52kg and 60kg as per tender,replacement of any type sleeper as per tender,dismantling and lifting old bg track up to 600mm with packing and filling as per tender,12 mm thick cement plaster as per tender,earth work as per tender,cleaning of jungle as per tender,brick work 250 mm thick as per tender,supply and laying plain cement concrete pcc as per tender,dismantling all types of plain cement concrete works as per tender,supply and laying of quarry dust as per tender,linking of bg track with all types of sleeper as per tender,picking up of slacks in track of all sleeper density as per tender,insertion of rails of all type and length in track as per tender,cleaning of side drains along the track as per tender,making kutcha trapezoidal side drain along the track as per tender,lifting for in
Casual renewal of psc sleepers on points and crossings as per tender,drilling of hole of different diameter and chamfering in rail as per tender,gas cutting of rail of various section as per tender,cutting cropping of rail of 52kg and 60kg as per tender,replacement of any type sleeper as per tender,dismantling and lifting old bg track up to 600mm with packing and filling as per tender,12 mm thick cement plaster as per tender,earth work as per tender,cleaning of jungle as per tender,brick work 250 mm thick as per tender,supply and laying plain cement concrete pcc as per tender,dismantling all types of plain cement concrete works as per tender,supply and laying of quarry dust as per tender,linking of bg track with all types of sleeper as per tender,picking up of slacks in track of all sleeper density as per tender,insertion of rails of all type and length in track as per tender,cleaning of side drains along the track as per tender,making kutcha trapezoidal side drain along the track as per tender,lifting for in
Read moreEarthwork excavation for foundation of fence,providing and laying boulder soling in foundation,prov
Read more
Jungle cleaning,earthwork excavation,filling,pcc,rcc upto foundation,rcc column,rcc beam,brickwork,
Read more
Single brick flat soiling,brick work 250 mm thick,earth filling with debris,filling in foundation,o
Read more
Single brick flat soling pathway
Construction of road/ pathway by single brick flat soling within durgapur sub-division hospital campus in the district of paschim bardhaman under pwd, asansol division&#x0d during the year 2023-2024&#x0d
Read moreSingle brick flat soling pathway
Construction of road/ pathway by single brick flat soling within durgapur sub-divisional hospital campus in the district of paschim bardhaman under pwd, asansol division&#x0d during the year 2023-2024.&#x0d
Read moreof your Industry type