Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Motor Control Center, 1000 Amp, 415 V, 3 Ph And Neutral, 50 Hz
|
Description |
|
Organisation | Department of Atomic Energy | PMO |
Tender Id | GEM/2025/B/5931904 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | February 19, 2025 15:36 |
End Date |
12/03/2025 ( Expired 94 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Three-year comprehensive annual maintenance contract (camc) for environmental control system (electrical, mechanical, water treatment plant and ro plant, excluding bms system) for 13 underground metro stations of l-2 and l-3 , and three-year..
Three-year comprehensive annual maintenance contract (camc) for environmental control system (electrical, mechanical, water treatment plant and ro plant, excluding bms system) for 13 underground metro stations of l-2 and l-3 , and three-year..
Read moreProcurement and installation of motor control centre for urea plant
Procurement and installation of motor control centre 
 for urea plant
Read moreWork contract for rubber liner work for cpu sevice vessels (tmd onsite) and various lines and vessels installed at dm plant and cpu regeneration area (tmd offsite) of unit 3 and 4, ph-ii, 2x660 mw, sstpp,mppgcl,dongalia.
Work contract for rubber liner work for cpu sevice vessels (tmd onsite) and various lines and vessels installed at dm plant and cpu regeneration area (tmd offsite) of unit 3 and 4, ph-ii, 2x660 mw, sstpp,mppgcl,dongalia.
Read moreSupply of topographical equipments for hiu, wrd under airbmp lot 3 supply of waterproof and handheld gps with accessories for hiu, wrd under airbmp
Supply of topographical equipments for hiu, wrd under airbmp&#x0d lot 3 supply of waterproof and handheld gps with accessories for hiu, wrd under airbmp
Read moreSupply of siddha medicines to nrhm wings under the control ofcommissioner of indian medicine and homoeopathy department
Supply of siddha medicines to nrhm wings under &#x0d the control ofcommissioner of indian medicine &#x0d and homoeopathy department
Read moreA/r and m.o to residential builiding under division no-3 at nabha estate shimla (sh -providing and fixing cupboard, pvc flooring,wall and floor tiles , painting and distempering etc in no. b-3-10 at nabha estate shimla )
A/r and m.o to residential builiding under division no-3 at nabha estate shimla&#x0d (sh -providing and fixing cupboard, pvc flooring,wall and floor tiles , painting and distempering etc in no. b-3-10 at nabha estate shimla )&#x0d
Read moreSs 304 bollard with ms pit,hydraulic pump,hoze pipe,3 phase motor,hydraulic system,control panel bo
Read more
6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
Read moreEa1008d spa 1882,ea1008d 132mb 5 5kw 2p 415 3 50,ea1008d a1409a300a,ea1008d en 083 0,ea1008d spa 15
Read more
Construction of 50 bedded critical care block g plus 3 at malda medical college and hospital_malda _sitc of lift
Name of work construction of 50 bedded critical care block g_plus_3 at malda medical college and hospital_malda _ sitc of lift
Read moreof your Industry type