Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
C.O Pucca Bharo To Lower Swana Road Km 0.0 To 2.100 In Distt Kangra H.P Sub Head Formation Cutting C.O R.Walls Cd Works P.L Gsb Wbmii.Wmbiii Tarring Pcc Drain Paraptes Road Side Furnitutre Including Five Year Maintenance Under Nabard Ridf Xxix
|
| Description |
C.O Pucca Bharo To Lower Swana Road Km 0.0 To 2.100 In Distt Kangra H.P Sub Head Formation Cutting C.O R.Walls Cd Works P.L Gsb Wbmii.Wmbiii Tarring Pcc Drain Paraptes Road Side Furnitutre Including Five Year Maintenance Under Nabard Ridf Xxix
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2024_PWD_84992_1 |
|
Reference Number |
TENDER NOTICE NO 8419-28 DATED 27.1.2024 |
| Tender Fee | 5000 |
| EMD | 2.7 Lakh |
| Tender Value | |
| Place | KOTLA BEHAR |
| Link |
View Original Tender Notice
https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=126446 |
| Start Date | February 02, 2024 22:00 |
| End Date |
Expired
09/02/2024
Expired 857 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of road from thulla basti to boie km 0/000 to 5/715 including 50.000 metre span bridge in district kangra (hp) under ridf-xxix (nabard)
Formation cutting, passing place, r/walls, c.d. works, gsb, wbm-ii, wbm-iii, tarring work, side drain and parapets including 50 mtr span bridge and five year routine maintenance under nabard ridf-xxix).
Read moreConstruction of kanol lag batuni morch road km 0/000 to 9/945 in district kangra (hp) under ridf-xxx (nabard)
Sh- formation cutting, passing places, r/walls, c.d. work, gsb, wbm-ii, wbm-iii, tarring work, cc pavement, side drain and parapets, raod sign board including five year routine maintenance
Read moreConstruction of patti to goharat in g.p. rajpur via harizan basti and gujjar basti bhader and panchayat ghar bhader road km 0/000 to 3/720 in district kangra (hp) under ridf-xxix (nabard)
(sw- formation cutting, passing places, r/walls, c.d.work, gsb, wet mix macadam, tarring work, cc pavement, side drain, sign board and parapets including 2 no. bridges) including maintenance of five years after completion of construction work).
Read moreC.o nand m.t link road raipur to bhakhawa via mallan di pind km 0.0 to 3.800 sub head balance work c.o r.wall cross draings work road side pcc drain and parapets etc in km 0.0 to 3.800 under nabard ridf-xxviii
C.o nand m.t link road raipur to bhakhawa via mallan di pind km 0.0 to 3.800 sub head balance work c.o r.wall cross draings work road side pcc drain and parapets etc in km 0.0 to 3.800 under nabard ridf-xxviii
Read moreConstruction of chaprehar wah toru road km 0/000 to 5/000 under (nabard) ridf-xxix in district kangra (hp)
F/c, c/o r/wall cd work, p/l gramular sub base, wbm-ii, wbm-iii, tarring, cement concrete pavement, road side drain, parapets and providing and fixing sign boards etc i/c maintenance for five year after completer of construction work.)
Read moreConstruction of chaprehar wah toru road km 0/000 to 5/000 under (nabard) ridf-xxix in district kangra (hp)
F/c, c/o r/wall cd work, p/l gramular sub base, wbm-ii, wbm-iii, tarring, cement concrete pavement, road side drain, parapets and providing and fixing sign boards etc i/c maintenance for five year after completer of construction work.)
Read moreConstruction of rangehar sadoon malmu to nera road km 0/000 to 5/200 including bridge over nera khad in district kangra (hp) under ridf-xxx (nabard)
Formation cutting, passing places, r/walls, c.d. work, gsb, wbm-ii, wbm-iii, tarring work, cc pavement, side drain and parapets including 19.75 mtr span bridge over nera khad including five years maintenance after completion of work
Read moreConstruction of chaprehar wah toru road km 0/000 to 5/000 under (nabard) ridf-xxix in district kangra (hp)
F/c, c/o r/wall cd work, p/l gramular sub base, wbm-ii, wbm-iii, tarring, cement concrete pavement, road side drain, parapets and providing and fixing sign&#x0d boards etc i/c maintenance for five year after completer of construction work.)
Read moreBalance work and metalling and tarring of mumta bhadrehar road km 0/000 to 1/852 in distt kangra (hp) under nabard (ridf- xxix)
Formation cutting, passing places, retaining walls, cross-drainage work, granular sub base, wbm-ii wbm-iii, tarring work, road side drain, parapets etcetera including routine maintenance for the year after completion of construction work
Read moreConstruction of link road from ghera sukughat chamyara bhitlu km 0/00 to 15/515 (balance work) in distt. kangra h.p (under nabard ridf xxvi)
Sh. construction of 40.00 mtr, span psc box grider bridge at rd 1/076 and formation cutting, passing places, r/wall, cross drainage work, gsb, wbm-ii, wbm-iii, tarring work, side drain and parapets in km 0/0 to 2/500) including five year routine main
Read moreof your Industry type