Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mark Ii Tube Well
|
| Description |
Installetion Of 1 No Mark Ii Tube Well In Front Of Swapan Podder House At Ukhulia Ii Sansad,Activity Id 89071464(2024 2025) Under Akcha Gram Panchayet.
|
| Organisation | Zilla Parishad | State Govt. and UT |
| Tender Id | 2024_ZPHD_774469_1 |
|
Reference Number |
8/AGP/2024-2025, SL NO 5 |
| Tender Fee | 500 |
| EMD | 1700 |
| Tender Value | - |
| Place | AKCHA G.P |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1714548 |
| Start Date | November 28, 2024 18:00 |
| End Date |
Expired
04/12/2024
Expired 659 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of type-ii ndx fully built 400 mofussil buses to kkrtc
Supply of type-ii ndx fully built 400 mofussil buses to kkrtc
Read moreRblisp liftii operation and maintenance of rblis lift-ii stage-i pumping station at thirumalayapally (v), madanapur (m) and stage-ii pumping station at kothakota (v,m), wanaparthy (dist) for the year 2026-27 (from 01.10.2026 to 30.09.2027)
Rblisp liftii operation and maintenance of rblis lift-ii stage-i pumping station at thirumalayapally (v), madanapur (m) and stage-ii pumping station at kothakota (v,m), wanaparthy (dist) for the year 2026-27 (from 01.10.2026 to 30.09.2027)
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreTggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Tggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Read morePackage ii laying of bt and ccroads, construction of storm water drains, minor bridge, ugd lines, cc drains and culverts in adilabad mpty under tufidc
Package ii laying of bt and ccroads, construction of storm water drains, minor bridge, ugd lines, cc drains and culverts in adilabad mpty under tufidc
Read moreSewerage projects in 27 ulbs under sbm 2.0 under jurisdiction of nalgonda and khammam ph divisions (package-ii) under ls contract system with hybrid annuity model
Sewerage projects in 27 ulbs under sbm 2.0 under jurisdiction of nalgonda and khammam ph divisions (package-ii) under ls contract system with hybrid annuity model
Read moreSupply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreMark ii tube well
Installation of mark ii tube well near shop of amar ghosh at gayeshpur sansad no. xxi within gayeshpur gram panchayat under 15th c.f.c. tied fund during 2024-25.
Read moreMark-ii tube well
Installetion of 4 nos mark-ii tube well-in front of surjamoni pujaru sarkar house,in front of ashrampara sadhu house,in front of nagashi sarkar house ,in front of shanti house at ukhulia-ii sansad under akcha gram panchayet.
Read moreof your Industry type