Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Flood Damage Repair Work Of The Road From Rabicharan Chowkidar Hour Para To Rabicharan Chowkidar Hour Para Jb School At Sumul River Left Side From Ch 0.100 Km Under Tulasikhar Block During The Year 2024 25 Sh Protection Of Road Side Erosion By Provid
|
| Description |
Works
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2024_CEPWD_53065_1 |
|
Reference Number |
62/SE-II/PWD/RandB/2024-25 |
| Tender Fee | 4000 |
| EMD | 1.42 Lakh |
| Tender Value | - |
| Place | Khowai |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=53920 |
| Start Date | September 23, 2024 15:30 |
| End Date |
Expired
30/09/2024
Expired 723 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Flood damage repair work of the road from rabicharan chowkidar hour para to rabicharan chowkidar hour para jb school at bemul river ch 0.183km under tulasikhar block during the year 2024 25 sh protection of road side erosion by providing cc block pi
Works
Read moreMtc. of road from rabicharan para to rabicharan chowkider para jb school from ch. 0.00 km to ch. 1.50 km under tulashikhar block during the year 2024 2025 sh recarpeting work
Works
Read moreMtc. of road from rabicharan para to rabicharan chowkider para jb school from ch. 0.00 km to ch. 1.50 km under tulashikhar block during the year 2024 2025 sh re carpeting work .2nd call
Works
Read moreDevelopment of road from rabicharan chow para to rabicharan chow jb school under tulashikhar block during the year 2024 25 sh construction of abutment wall wing wall and launching of bailey bridge protection work etc.
Works
Read moreStrengthening of road from jb para-bhagirath para part-iii pmgsy road to girachandra para (l-1.60 km)/sh- patch wbm-ii, wbm-iii, carpeting, road furniture, side drain etc.
Strengthening of road from jb para-bhagirath para part-iii pmgsy road to girachandra para (l-1.60 km)/sh- patch wbm-ii, wbm-iii, carpeting, road furniture, side drain etc.
Read moreImprovement of road from rabicharan para to chowkider hour para length 1.50km from ch 0.50km to ch 1.00km under tulashikhar rd block during the year 2025 26 sh gsb, wbm 2 and wbm3, carpeting, seal coat, retaining wall, cd and protection work etc
Improvement of road from rabicharan para to chowkider hour para length 1.50km from ch 0.50km to ch 1.00km under tulashikhar rd block during the year 2025 26 sh gsb, wbm 2 and wbm3, carpeting, seal coat, retaining wall, cd and protection work etc
Read moreMtc of flat brick soling with both side drain road from chulaiha para to dharmarai par ompi road under jb para adc vc of dumburnagar rd block
Cnostruction
Read moreMtc. of flat brick soling with both side drain from jb para bhagirath pwd road to nabakumar para tsr camp of bhagirath vc under rd gonda twisa division.
Construction
Read moreStrengthening of gonda twisa-raishyabari road to laxman sarkar house road via vivekananda club, chowkidar para (l - 2.10 km)/sh- pot holes repairing, carpeting, road furniture, side drain etc.
Strengthening of gonda twisa-raishyabari road to laxman sarkar house road via vivekananda club, chowkidar para (l - 2.10 km)/sh- pot holes repairing, carpeting, road furniture, side drain etc.
Read moreMtc of road from bye pass to oria para via existing rcc bridge (spt bridge no 596) under dukli sub division, pwd (rnb) during the year 2025_26_sh construction of road side drain near trijunction of oria para jb school
Mtc of road from bye pass to oria para via existing rcc bridge (spt bridge no 596) under dukli sub division, pwd (rnb) during the year 2025_26_sh construction of road side drain near trijunction of oria para jb school
Read moreof your Industry type