Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Flood Damage Repair Work Of The Road From Rabicharan Chowkidar Hour Para To Rabicharan Chowkidar Hour Para Jb School At Bemul River Ch 0.183 Km Under Tulasikhar Block During The Year 2024 25 Sh Protection Of Road Side Erosion By Providing Cc Block Pi
|
| Description |
Works
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2024_CEPWD_53064_1 |
|
Reference Number |
61/SE-II/PWD/RandB/2024-25 |
| Tender Fee | 4000 |
| EMD | 1.44 Lakh |
| Tender Value | - |
| Place | Khowai |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=53918 |
| Start Date | September 23, 2024 15:30 |
| End Date |
Expired
30/09/2024
Expired 723 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Flood damage repair work of the road from rabicharan chowkidar hour para to rabicharan chowkidar hour para jb school at sumul river left side from ch 0.100km under tulasikhar block during the year 2024 25 sh protection of road side erosion by provid
Works
Read moreMtc. of road from rabicharan para to rabicharan chowkider para jb school from ch. 0.00 km to ch. 1.50 km under tulashikhar block during the year 2024 2025 sh recarpeting work
Works
Read moreMtc. of road from rabicharan para to rabicharan chowkider para jb school from ch. 0.00 km to ch. 1.50 km under tulashikhar block during the year 2024 2025 sh re carpeting work .2nd call
Works
Read moreDevelopment of road from rabicharan chow para to rabicharan chow jb school under tulashikhar block during the year 2024 25 sh construction of abutment wall wing wall and launching of bailey bridge protection work etc.
Works
Read moreImprovement of road from rabicharan para to chowkider hour para length 1.50km from ch 0.50km to ch 1.00km under tulashikhar rd block during the year 2025 26 sh gsb, wbm 2 and wbm3, carpeting, seal coat, retaining wall, cd and protection work etc
Improvement of road from rabicharan para to chowkider hour para length 1.50km from ch 0.50km to ch 1.00km under tulashikhar rd block during the year 2025 26 sh gsb, wbm 2 and wbm3, carpeting, seal coat, retaining wall, cd and protection work etc
Read moreFlood damage repairing work of the road from anath chow para to petramura l6.64 km under tulasikhar rd blockduring the year 2024 2025 sh wbm iii recarpeting seal coat cd work cc block pucca drain etc. ch. 3.32 km to ch. 6.64 km.
Works
Read moreFlood damage repairing work of the road from anath chow para to petramura l 6.64 km under tulasikhar rd blockduring the year 2024 2025 sh wbm iii re carpeting seal coat cd work cc block pucca drain etc. ch. 0.00 km to ch. 3.32 km
Works
Read moreUrgent flood damage repair of road from td road to chowkidar para from ch.0.90km to ch.1.12 km under damcherra sub division, pwd r and b during the year 2024 2025 sh wbm iii, carpeting, seal coating, surface drain,pucca drain, box culvert, return wal
Urgent flood damage repair of road from td road to chowkidar para from ch.0.90km to ch.1.12 km under damcherra sub division, pwd r and b during the year 2024 2025 sh wbm iii, carpeting, seal coating, surface drain,pucca drain, box culvert, return wa
Read moreof your Industry type