Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Retaining Wall Near F6 Residence
|
| Description |
Construction Of Retaining Wall Near F6 Residence
|
| Organisation | Indian Institute of Management Kozhikode | Autonomous Bos |
| Tender Id | 5123 |
|
Reference Number |
IIMK/CIVIL/e-50/2024-25 |
| Tender Fee | 0 |
| EMD | 38500 |
| Tender Value | |
| Place | IIM Kozhikode-Purchase-Kerala-Kozhikode |
| Link |
View Original Tender Notice
https://mhrd.ewizard.in/ |
| Start Date | July 26, 2024 15:50 |
| End Date |
Expired
08/08/2024
Expired 697 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of retaining wall in pond area at akshra devi tempil block-dakore
Construction of retaining wall in pond area at akshra devi tempil block-dakore
Read moreProvn of retaining wall at various locations of cijws vairengte under vairengte mil stn
Provn of retaining wall at various locations of cijws vairengte under vairengte mil stn
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreCompound wall repair work near gokulam paddock shed-at vengad
Compound wall repair work near gokulam paddock shed-at vengad
Read moreRepair and renovation of assistant executive engineer residence at sub division marwah
Repair and renovation of assistant executive engineer residence at sub division marwah
Read moreRestoration of rain damages on danoi khood drabil raod km. 0/00 to 18/945 (sh c/o pcc retaining wall from rd. 5/885 to 5/897).
Restoration of rain damages on danoi khood drabil raod km. 0/00 to 18/945 (sh c/o pcc retaining wall from rd. 5/885 to 5/897).
Read moreConstruction of toe wall, r...
Construction of toe wall, removing and re- fixing interlocking g.i. wire mesh on toe wall and providing and fixing of new interlocking g.i., wire mesh at missing places including etc and all other works contingent there to in front of sco - 85 to sco
Read moreConstruction of memorial for tourist attraction near katra masjid
Construction of memorial for tourist attraction near katra masjid
Read moreConstruction of safety wall and interlocking on the embankment of the pond in village tahla
Construction of safety wall and interlocking on the embankment of the pond in village tahla
Read moreConstruction of new police barrack at gwalthai near hp police chowki
Construction of new police barrack at gwalthai near hp police chowki
Read moreof your Industry type