Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Strengthening And Repairing Of Tilaboni Pit No 3 Head Gear Base Slab And Wall For Safety Point Of View Under Tilaboni Colliery
|
Description |
Strengthening And Repairing Of Tilaboni Pit No 3 Head Gear Base Slab And Wall For Safety Point Of View Under Tilaboni Colliery
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_ECL_299909_1 |
Reference Number |
ECL/BA/GM/Civil/e Tender/23-24/400 Dt 27.01.2024 |
Tender Fee | 0 |
EMD | 10500 |
Tender Value | |
Place | Tilaboni Colliery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=310662 |
Start Date | January 31, 2024 22:30 |
End Date |
10/02/2024 ( Expired 492 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreHiring services of one no. brand new vehicle diesel driven, bs vi or latest compliance, brand mahindra bolero model b4 base model 2 wheeled drive under oil, ps6, bongaigaon for a period of 4 years
Hiring services of one no. brand new vehicle diesel driven, bs vi or latest compliance, brand mahindra bolero model b4 base model 2 wheeled drive under oil, ps6, bongaigaon for a period of 4 years
Read moreConstruction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipur north) with installation of opgw network on existing line including survey, supply under bn-9018002511
Construction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipuir north) with installation of opgw network on existing line including survey, supply under bn-9018002511(turnkey)
Read moreSpecial repair to building no p-3/83 (01 to 08) and p-3/84 (05 to 08) or md accn of med regt at mil stn jammu under ge satwari
Special repair to building no p-3/83 (01 to 08) and p-3/84
 (05 to 08) or md accn of med regt at mil stn jammu
 under ge satwari
Read moreRenovation work of building and construction of boundary wall at samajik chetna kendra near mangal bhavan ward no. 55 file no. 154/25x3/3
Renovation work of building and construction of boundary wall at samajik chetna kendra near mangal bhavan ward no. 55 file no. 154/25x3/3
Read moreNiet no. - 12 of the fy 2025-2026 of the ee/bqa, phe dte.(sl.no-02)
Additional length of crossing of rail line in between km by adopting trench less technologies (e.g. jack pushing method etc.) for railway track crossing for laying of pipe line for water supply to hamirhati and its adjoining mouzas under rampur
Read moreConstruction of rrm protection wall at new tower no.: 04
Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge
Read moreSupply stacking of stone boulder 150-200 mm for pmt works to be supplied at hq ce(p)arunank and old brtf location naharlagun under 119 rcc/756 brtf of project arunank in the state of arunachal pradesh, job no. r-4309/04/756tf
Supply stacking of stone boulder 150-200 mm for pmt works to be supplied at hq ce(p)arunank and old brtf location naharlagun under 119 rcc/756 brtf of project arunank in the state of arunachal pradesh, job no. r-4309/04/756tf
Read moreImplementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreof your Industry type