Tender Details
Particulars | Details |
---|---|
Title |
Nit 05 Of 2024 25 (Engg Sec)
|
Description |
Two Nos Of Ac Machine With Votage Stabilizer At Pcpndt Cell At The Dfwb Section Purba Bardhaman
|
Organisation | HEALTH AND FAMILY WELFARE DEPARTMENT | State Govt. and UT |
Tender Id | 2024_HFW_715669_1 |
Reference Number |
NIT05 of 2024-25 (Engg Sec) |
Tender Fee | 0 |
EMD | 2860 |
Tender Value | |
Place | Purba Bardhaman |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1572057 |
Start Date | July 24, 2024 15:30 |
End Date |
31/07/2024 ( Expired 296 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreProcurement of mtu main engine rkit 25 spares
Procurement of mtu main engine rkit 25 spares
Read moreRequest for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Request for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Read moreDesign, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Design, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Read moreDevelopment of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreNit for supply and installation of video conferencing equipments
Nit for supply and installation of video conferencing equipments
Read moreO n m of 4laning of kutchery chowk ranchi piska more bijupara sec of nh75 (km.3.560 to km. 55.000)piska more palma section of nh23 km.3.600 to km.26.000 excluding 1.17 km l 72.67 km on pbmc in the state of jharkhand.
O n m of 4laning of kutchery chowk ranchi piska more bijupara sec of nh75 (km.3.560 to km. 55.000)piska more palma section of nh23 km.3.600 to km.26.000 excluding 1.17 km l 72.67 km on pbmc in the state of jharkhand.
Read moreAAAAAAAAAA
Login to viewProcurement of 8 nos. portable stationary compactor and 4 nos. hook loader and operation and maintenance of the 8 nos. portable stationary compactor and 4 nos. hook loader for five years.
Read moreGrant of license for supply, installation, commissioning, operation and maintenance of 01 no. 100 ton capacity hmcs for a period of 05 years.
Grant of license for supply, installation, commissioning, operation and maintenance of 01 no. 100 ton capacity hmcs for a period of 05 years.
Read moreConsultancy services for preparation of dpr to mitigate the bottlenecks from punjab/ut border near zirakpur flyover to poultry farm chowk including de-congestion of old airport chowk, halo majra t-point and poultry farm chowk on nh-05 (approx. length
Consultancy services for preparation of dpr to mitigate the bottlenecks from punjab/ut border near zirakpur flyover to poultry farm chowk including de-congestion of old airport chowk, halo majra t-point and poultry farm chowk on nh-05 (approx. length
Read moreof your Industry type