Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of 2 No. Weigh Bridge At Docp Under Cv Area
|
| Description |
Repairing Of 2 No. Weigh Bridge At Docp Under Cv Area
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2025_BCCL_337409_1 |
|
Reference Number |
BCCL/XII/ACE/ e-Tender-7/2025-26/273 Date-07.06.2025 |
| Tender Fee | 0 |
| EMD | 4700 |
| Tender Value | - |
| Place | CV AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=349771 |
| Start Date | June 14, 2025 16:30 |
| End Date |
Expired
24/06/2025
Expired 458 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Outsourcing contract for dismantling and laying of 3.3kv and 230v oht lines at gdkcm (no.2,2a and 5), rg.i area for a period of 2 years on rate contract basis
Outsourcing contract for dismantling and laying of 3.3kv and 230v oht lines at gdkcm (no.2,2a and 5), rg.i area for a period of 2 years on rate contract basis
Read moreProviding 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreHiring of 5 no.s of 15t capacity tippers for re-handling of coal at ktroc, jvroc and rchp kothagudem area for a period of 2 years
Hiring of 5 no.s of 15t capacity tippers for re-handling of coal at ktroc, jvroc and rchp kothagudem area for a period of 2 years
Read moreSupply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreHiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreRepairing of 3 no bathroom including agent docp at docp office complex under cv area
Repairing of 3 no bathroom including agent docp at docp office complex under cv area
Read moreLaying of paver block at docp office complex under docp cv area
Laying of paver block at docp office complex under docp cv area
Read moreRepairing maintenance of 4 units qtr at lal bazar 4 no dhowra under docp cv area
Repairing maintenance of 4 units qtr at lal bazar 4 no dhowra under docp cv area
Read moreCleaning, c.i. test weights shifting at docp road weigh bridge-ll to new road weigh bridge at docp.
Cleaning, c.i. test weights shifting at docp road weigh bridge-ll to new road weigh bridge at docp.
Read moreof your Industry type