Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Dld 1 110 12 1 2
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | July 03, 2025 01:07 |
End Date |
23/07/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Pole contactor required to overhauling of 25 ton eot crane of 415v, 32 amp, coil voltage 110 of siemens, abb or bch make.
For complete deion and other details, please refer to tender
Read moreAoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreDye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreTolling operation maintenance and transfer of purnea dalkhola raiganj section of nh-27 and 12 in the state of bihar and west bengal (tot bundle-22)
Tolling operation maintenance and transfer of purnea dalkhola raiganj section of nh-27 and 12 in the state of bihar and west bengal (tot bundle-22)
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreSelection of project management company (pmc) for project management consultancy services (pmcs) and detailed design consultant (ddc) for chennai metro rail phase 1 network capacity enhancement project
Selection of project management company (pmc) for project management consultancy services (pmcs) and detailed design consultant (ddc) for chennai metro rail phase 1 network capacity enhancement project
Read moreConsultancy services for preparation of detailed project report for construction of additional 2 lane rob of chouri chura and deoria rob of nh-727a in the state of uttar pradesh
Consultancy services for preparation of detailed project report for construction of additional 2 lane rob of chouri chura and deoria rob of nh-727a in the state of uttar pradesh
Read moreConstruction of road from km 17.812 to km 55.377 (package-2) of bile- migging section (km 0.00 at migging end) of nh-913 (frontier highway) to intermediate lane on epc mode in the state of arunachal pradesh
Construction of road from km 17.812 to km 55.377 (package-2) of bile-
 migging section (km 0.00 at migging end) of nh-913 (frontier highway) to
 intermediate lane on epc mode in the state of arunachal pradesh
Read moreConstruction of road from km 0.00 to km 27.430 (package-1) of bile- migging section (km 0.00 at bile) of nh-913 (frontier highway) to intermediate lane on epc mode in the state of arunachal pradesh
Construction of road from km 0.00 to km 27.430 (package-1) of bile-
 migging section (km 0.00 at bile) of nh-913 (frontier highway) to intermediate
 lane on epc mode in the state of arunachal pradesh
Read moreConsultancy services for preparation of detailed project report (dpr) for widening to 2 lane ps from haraiya- bhabhnana-swaminarayan- manakpur to gonda section of nh-727g in the state of uttar pradesh.
Consultancy services for preparation of detailed project report (dpr) for widening to 2 lane ps from haraiya- bhabhnana-swaminarayan- manakpur to gonda section of nh-727g in the state of uttar pradesh.
Read moreof your Industry type