Tender Details
Particulars | Details |
---|---|
Title |
Supply Of Argon Gas 99.998% Purity With H2 O Less Than 4 Ppm O2 Less Than 2 Ppm In Quards Consisting
|
Description |
|
Organisation | Department of Defence Production | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | May 09, 2025 16:42 |
End Date |
30/05/2025 ( 20 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreSupply of argon gas 99.998% purity with h2o less than 4 ppm o2 less than 2 ppm in quards consisting
Read more
Rehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Rehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Read moreMaintenance of rehabilitation and upgradation of existing carriageway to 2 lane 4 lane with paved shoulder configuration from wadigodri to dhangripimpri km 0 000 to km 30 390 section of nh753h on epc mode in the state of maharashtra package1 risk and
Maintenance of rehabilitation and upgradation of existing carriageway to 2 lane 4 lane with paved shoulder configuration from wadigodri to dhangripimpri km 0 000 to km 30 390 section of nh753h on epc mode in the state of maharashtra package1 risk and
Read moreTender for internal improvement works of cluster section no. s-376 (package-3) for water supply schemes 1. kawan wali 2. chak rohella 3. mahatam nagar 4. hasta kalan 5. nawan hasta 6. jhanger bhaini (rette wali bhaini) block and distt. fazilka
Providing, stringing out pvc pipes , household connections, water meter, disinfection unit, painting / installation of sign board etc. complete in all respect and all other works contgent there to. (under state share / jjm)
Read moreSupply, installation and commissioning (with 6 years camc after 2 years warranty period) of 140 mt pit less in-motion railway electronic weighbridge (15 kmph) at bahula siding as per rdso specification no. wd-29-misc-19 (rev-1)(with latest ammendment
Supply, installation and commissioning (with 6 years camc after 2 years warranty period) of 140 mt pit less in-motion railway electronic weighbridge (15 kmph) at bahula siding as per rdso specification no. wd-29-misc-19 (rev-1)(with latest ammendment
Read moreDismantling and erection of metalic expansion joints ( 1.rcej 4/5000x3100x561, 2.rcej4/4100x3700x561, 3.rcej1-half size/3874x5574x81mm 4.rcej1/7000x4000x186) along with protection plate and welding of corner piece of expansion joint rcej2-3058x3358x272mm in unit-ix in the annual overhaul period.
Dismantling and erection of metalic expansion joints 1.rcej 4/5000x3100x561 2.rcej 4 4100x3700x561 3.rcej 1-half size 3874x5574x81mm and 4.rcej 1 7000x4000x186 along with protection plate and welding of corner piece of expansion joint rcej 2-3058x3358x272mm in unit-ix in the annual overhaul period.
Read moreCivil and other miscellaneous maintenance works involving plumbing, carpentry, masonry etc. including supply of all materials in the companys owned or hired installations or buildings in the districts of uttar pradesh and new delhi for a period of 2 years with a provision of another one year extension at the same rate,terms and conditions
Civil and other miscellaneous maintenance works involving plumbing, carpentry, masonry etc. including supply of all materials in the companys owned or hired installations or buildings in the districts of uttar pradesh and new delhi for a period of 2 years with a provision of another one year extension at the same rate,terms and conditions
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreof your Industry type