Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
25 Kv Ac Ohe Modification Work In Connection With Construction Of Rob I) Lc 69 A At Km 688/14 16 In Mlr Cd Section. Ii) Lc 79 At Km 725/22 24 In Tln Plo Section Iii) Nhai Rob Between Khapri Gumgaon Section Iv) Nhai Rob Between Bharatwada Godhani Section V) Mominpura Rob On Nagpur Hawara Section Section In Nagpur Division Of Central Railway.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 78116506 |
|
Reference Number |
NGP-ELECT-TRD2024-25-06R3 |
| Tender Fee | 0 |
| EMD | 1.72 Lakh |
| Tender Value | - |
| Place | Mumbai CST |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/112024/78116506/viewNitPdf_4753528.pdf |
| Start Date | November 05, 2024 17:21 |
| End Date |
Expired
27/11/2024
Expired 687 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Proposed construction of rob for elimination of manned lc at lc no. 554 at km 1098/33-35 between chcr (chacher)-sal(salwa) block section.
Proposed construction of rob for elimination of manned lc at lc no. 554 at km 1098/33-35 between chcr (chacher)-sal(salwa) block section.
Read moreSw-i: has-sklr section: proposed closure of lc no. 39 at km. 35/300-400 by diverting traffic through lc no.38 at km. 34/900-35/000 duly constructing road parallel to the track between lc no. 39 to lc no 38.sw-ii: mys-has section: proposed closure of lc no. 65 at km. 70/385 by diverting traffic through rob no. 145b at km. 71/216 by construction of a road parallel to track between lc no.65 and rob no.145b
Sw-i: has-sklr section: proposed closure of lc no. 39 at km. 35/300-400 by diverting traffic through lc no.38 at km. 34/900-35/000 duly constructing road parallel to the track between lc no. 39 to lc no 38.sw-ii: mys-has section: proposed closure of lc no. 65 at km. 70/385 by diverting traffic through rob no. 145b at km. 71/216 by construction of a road parallel to track between lc no.65 and rob no.145b
Read moreS&t work inconnection with provision of 2-lane road over bridge (rob) in lieu of lc no: 116 at km: 933/08-10 between gurla-keshorai patan stations .[2026]
S&t work inconnection with provision of 2-lane road over bridge (rob) in lieu of lc no: 116 at km: 933/08-10 between gurla-keshorai patan stations .[2026]
Read more1) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg lc no.137 at km 457/300-400 by air pushing method between vanjipalaiyam and somanur stations. 2) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg. lc no.141 at km 463/23-25 by air pushing method between somanur and sulur road stations. 3) proposed 1x7.0x3.60m rcc pre-cast box subway in addition to pro. rob in lieu of exg. lc no.142 at km 466/21-23 by air push
1) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg lc no.137 at km 457/300-400 by air pushing method between vanjipalaiyam and somanur stations. 2) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg. lc no.141 at km 463/23-25 by air pushing method between somanur and sulur road stations. 3) proposed 1x7.0x3.60m rcc pre-cast box subway in addition to pro. rob in lieu of exg. lc no.142 at km 466/21-23 by air push
Read moreConstruction of 2 lane rob including approaches in lieu of lc no.29-c at km 47/19-21 between sonik-unnao section in lucknow division on northern railway under dy. ce/c-iv/lucknow on northern railway.
Construction of 2 lane rob including approaches in lieu of lc no.29-c at km 47/19-21 between sonik-unnao section in lucknow division on northern railway under dy. ce/c-iv/lucknow on northern railway.
Read moreConstruction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Construction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Read moreTender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.
Tender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.
Read moreTrd related work in connection to the work of utility shifting for construction of rob at railway km 214.954 in liu of lc no. rv-172 at railway km 215/5-7 on nh-201(chainage 176km) near kesinga between kesinga-titlagarh station in titlagarh-theruvali section under sambalpur division .
Trd related work in connection to the work of utility shifting for construction of rob at railway km 214.954 in liu of lc no. rv-172 at railway km 215/5-7 on nh-201(chainage 176km) near kesinga between kesinga-titlagarh station in titlagarh-theruvali section under sambalpur division .
Read more1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
Read moreConstruction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreof your Industry type