Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Balance Work Of Majalgoan Loni Sawangi Lift Scheme Tq. Majalagaon Dist. Beed Such As C.C. Lining To Canal, Structure On Canal And Bituminous Road Along With Raising Main And Canal Side Etc.
|
Description |
Construction Of Balance Work Of Majalgoan Loni Sawangi Lift Scheme Tq. Majalagaon Dist. Beed Such As C.C. Lining To Canal, Structure On Canal And Bituminous Road Along With Raising Main And Canal Side Etc.
|
Organisation | CE and CA CADA Aurangabad | State Govt. and UT |
Tender Id | 2025_CCCA_1160264_1 |
Reference Number |
E Tender Notice No.3 year 2024-25 Loni Sawangi Balance Work |
Tender Fee | 6400 |
EMD | 17.34 Lakh |
Tender Value | |
Place | Majalgoan |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2017865 |
Start Date | March 13, 2025 16:10 |
End Date |
27/03/2025 ( Expired 80 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of residual work and lining of main canals of ramrekha reservoir scheme, dist-simdega.
Construction of residual work and lining of main canals of ramrekha reservoir&#x0d scheme, dist - simdega
Read moreOperation and maintenance of alirajpur lift irrigation scheme for 03 years including its pressurized pipe distribution network for irrigation in 35000 hectares cca on turnkey contract as per detailed scope of work (but not limited of that).
Operation and maintenance of alirajpur lift irrigation scheme for 03 years including its pressurized pipe distribution network for irrigation in 35000 hectares cca on turnkey contract as per detailed scope of work (but not limited of that).
Read moreStrengthening and bituminous overlay along with other rectification activities-drain cover replacement, kerb raising, mbcb replacement, painting etc. of orai bhognipur barah section on bot (annuity) basis in the state of up-3rd call
Strengthening and bituminous overlay along with other rectification activities-drain cover replacement, kerb raising, mbcb replacement, painting etc. of orai bhognipur barah section on bot (annuity) basis in the state of up-3rd call
Read more1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material,
1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material
Read moreConstruction of cr on left main canal at 1560 m. under tedhwa shivni lift irrigation scheme. tal. dist. gondia
Construction of cr on left main canal at 1560 m. under tedhwa shivni lift irrigation scheme. tal. dist. gondia
Read moreTender for raising of boundary wall on southern side and northern side of the aiims jodhpur campus (along the main road and cazri road)
Tender for raising of boundary wall on
 southern side and northern side of the
 aiims jodhpur campus (along the main
 road and cazri road)
Read more1st class brick lining work with 60 percent new brick from (0.00 to 0.400) km alongwith cement pointing on both side, top of the walls and cc work in bed with glass strip from (0.00 to 0.400) km and repairing of delivery tank at rudauli pump canal in
1st class brick lining work with 60 percent new brick from (0.00 to 0.400) km alongwith cement pointing on both side, top of the walls and cc work in bed with glass strip from (0.00 to 0.400) km and repairing of delivery tank at rudauli pump canal
Read more1st class brick for lining of canal with 100 percent new brick alongwith main canal bed from chainage (0.450 to 1.00) km with all cost of material, labour, tool and plant etc as required as per drawing and boq at phagoopur pump can
1st class brick for lining of canal with 100 percent new brick alongwith main canal bed from chainage (0.450 to 1.00) km with all cost of material, labour, tool and plant etc as required as per drawing and boq at phagoopur pump canal in raibareli
Read more1st class brick lining work with 100 percent new brick from chanage (0.00 to 0.700) km along with cement plaster on both side and cc work on bed with glass strip from (0.00 to 0.700)km at adaura pump canal in district barabanki including all cost of
1st class brick lining work with 100 percent new brick from chanage (0.00 to 0.700) km along with cement plaster on both side and cc work on bed with glass strip from (0.00 to 0.700)km at adaura pump canal in district barabanki including all cost of
Read moreRenovation of 33/3.3 kv power transformers switchyard equipments with allied accessories and hardware etc complete along with 2 years operation work for lower terana lift irrigation scheme stage no 1 to 5
Renovation of 33 3 3 kv power transformers switchyard equipments with allied accessories and hardware etc complete along with 2 years operation work for lower terana lift irrigation scheme stage no 1 to 5
Read moreof your Industry type