Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of 2 Lane Rob Including Viaducts Approaches Service Roads And Limited Height Subway (Lhs) In Lieu Of Lc86 At Indian Railway Km 38/9 39/0 Alwar Rewari Section Between Sodawas Harsauli Nuh Road (Sh 108) At Harsuli In District Alwar
|
Description |
Construction Of 2 Lane Rob Including Viaducts Approaches Service Roads And Limited Height Subway (Lhs) In Lieu Of Lc86 At Indian Railway Km 38/9 39/0 Alwar Rewari Section Between Sodawas Harsauli Nuh Road (Sh 108) At Harsuli In District Alwar
|
Organisation | Government of Rajasthan |
Tender Id | 2023_CEPWD_368523_1 |
Reference Number |
NIT NO. 35/2023-24 ACE ZONE-II, JAIPUR |
Tender Fee | 5000 |
EMD | 64.84 Lakh |
Tender Value | |
Place | ACE PWD ZONE-II JAIPUR |
Link | https://eproc.rajasthan.gov.in |
Start Date | September 20, 2023 15:00 |
End Date |
19/10/2023 ( Expired 613 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreConst. of 2 lane rob with the bow string steel beam in lieu of lc no. 118-c/e-2 at km. 250/9-11 in between dukheri- kesri railway station on sre-umb section on dfcc route in ambala distt. (rd. km. 0.00 to 0.585). (pdg. solar street light).
Const. of 2 lane rob with the bow string steel beam in lieu of lc no. 118-c/e-2 at km. 250/9-11 in between dukheri- kesri railway station on sre-umb section on dfcc route in ambala distt. (rd. km. 0.00 to 0.585). (pdg. solar street light).
Read moreConstruction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Construction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Read moreConstruction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Read moreConstruction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Construction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Read moreConstruction of complete rob & limited height subway in lieu of lc 4 (railway portion except steel girder approach road in state portion) at km 60/23-25 in indara yard, lc 67c (railway portion including steel girder approach road in state portion) at km 95/273 between kkt-pou section & lc 115 (only railway portion including bow string girder) at km 433/723 in btt yard of varanasi division in n. e. railway
For complete deion and other details, please refer to tender
Read moreConstruction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Construction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Read morePreparation of gad /structural drawings, design calculations, soil exploration, preparation of land plan required for acquisition, utility shifting drawing etc and submission of detailed project report (dpr) for road over bridge (rob proper & approaches) over railway track in lieu of (i) lc no.1/a at km. 306/0-1 between bhagalpur- nathnagar (ii) lc no.6 at km. 279/9-280/0 between ekchari-ghogha of malda division. (iii) lc no.9 at km. 328/8-9 between akbarnagar-sultanganj.
For complete deion and other details, please refer to tender
Read more1) pkd-dmm doubling- construction of road over bridge (1x36 composite girder) 5x18.71 psc girders and other connected works at ch:162115 in lieu of lc no.102 at ch: 162178 between makkajipalli (mkj) to nagasamudram (ngm) station. 2)ynk-pkd-construction of approach roads using re wall technique for rob in lieu of 71 at chakaralapalli yard between ynk-pkd section including construction of limited height subway (lhs) of size (5.5mx2.75m) (composite work)
For complete deion and other details, please refer to tender
Read moreBalance work of construction of proposed 4 lane rob and its approaches in lieu of existing level crossing no.124e/spl3 at km 1.800 on nh 205 between prasannayapalle n zangalapalle railway stations on anantapur dharmavaram railway section in the stat
Balance work of construction of proposed 4 lane rob and its approaches in lieu of existing level crossing no.124e/spl3 at km 1.800 on nh 205 between prasannayapalle n zangalapalle railway stations on anantapur dharmavaram railway section in the stat
Read moreof your Industry type