Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚧 Procurement Notice: Lt Control Panel Components Replacement For Tubewell No. 6 🚧 The Public Health Engineering (Phe) Department Of The State Government And Union Territories Invites Bids For The Replacement Of Components To The Low Tension (Lt) Control Panel Of Tubewell No. 6 Located At Boria And Gorkha Nagar, For A 50 Hp High Speed (Hc) Motor Installed At The Capitol Point Scheme (Cps) In Jammu. 📅 Bid Submission Deadline: May 13, 2024, 3:00 Pm Tender Fee: Inr 200 Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Pricing, And A Timeline For The Completion Of The Project. Bidders Should Ensure Their Proposals Meet The Technical And Financial Criteria Set Forth By The Phe. Keywords: Phe, State Govt. And Ut, Tubewell Control Panel, 50 Hp Hc Motor, Jammu, Procurement, Bid, Electrical Components, Water Supply| Particulars | Details |
|---|---|
| Title |
Replacement Of Components To Lt Control Panel Of Tubewell No 6 Boria And Gorkha Nagar For 50 Hp Hc Motor Installed At Cps Boria
|
| Description |
Replacement Of Components To Lt Control Panel Of Tubewell No 6 Boria And Gorkha Nagar For 50 Hp Hc Motor Installed At Cps Boria
|
| Organisation | PHE | State Govt. and UT |
| Tender Id | 2024_PHE_248448_1 |
|
Reference Number |
e-NIT PHEJ/MS/03 of 2024-25 Dated 04-05-2024 |
| Tender Fee | 200 |
| EMD | 0 |
| Tender Value | - |
| Place | Jammu |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=724349 |
| Start Date | May 07, 2024 15:30 |
| End Date |
Expired
13/05/2024
Expired 838 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing and fitting of components to lt control panel of unit no 10 installed at cps boria under non plan
Providing and fitting of components to lt control panel of unit no 10 installed at cps boria under non plan
Read moreRepair to 300 hp hc motor unit 01 for narwal installed at cps boria under non plan
Repair to 300 hp hc motor unit 01 for narwal installed at cps boria under non plan
Read moreProviding/replacement of damaged components of lt control panel of hc motor along with allied works installed at cps domana.
Providing/replacement of damaged components of lt control panel of hc motor along with allied works installed at cps domana.
Read moreMajor repair to the rotor of 335 hp hc pump motor unit 04 for narwal installed at cps boria under non plan
Major repair to the rotor of 335 hp hc pump motor unit 04 for narwal installed at cps boria under non plan
Read moreProviding and fitting of components to 1.0 lac gph x 120 mtr head x 300 hp hc pump unit - 01 for water supply to narwal installed at cps boria
Providing and fitting of components to 1.0 lac gph x 120 mtr head x 300 hp hc pump unit - 01 for water supply to narwal installed at cps boria
Read moreRepair/replacement of damaged components of lt control panel of hc pumping unit no. 01 of cps parade
Repair/replacement of damaged components of lt control panel of hc pumping unit no. 01 of cps parade
Read moreRepair / replacement of damaged components of lt control panel of hc pumping unit no. 04 of cps parade
Repair / replacement of damaged components of lt control panel of hc pumping unit no. 04 of cps parade
Read moreUpkeepment of major components of damaged auto transformer starter (ats) panel of 225 hp hc motor installed at cps laboratory along with allied works
Upkeepment of major components of damaged auto transformer starter (ats) panel of 225 hp hc motor installed at cps laboratory along with allied works
Read moreReplacement of electrical gadgets of ats panel for 200 hp hc motor installed at cps r-22
Replacement of electrical gadgets of ats panel for 200 hp hc motor installed at cps r-22
Read moreUpkeepment of major components of damaged lt control panel of hc motor( unit- iii) installed at cps medical pump room-ii along with allied works
Upkeepment of major components of damaged lt control panel of hc motor( unit- iii) installed at cps medical pump room-ii along with allied works
Read moreof your Industry type