Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🔧 Invitation For Bids: Repair Of 300 Hp Hc Motor 🚧 The Public Health Engineering (Phe) Department Of The State Government And Union Territories Invites Bids For The Repair Of A 300 Hp Hc Motor (Unit 01 For Narwal) Installed At Cps Boria, Jammu, Under The Non Plan Category. 📅 Bid Submission Deadline: May 13, 2024, 3:00 Pm Tender Fee: Inr 200 Interested Bidders Must Possess The Technical Expertise And Experience Required For The Repair Of Heavy Duty Motors. Proposals Should Include Detailed Technical Specifications, Repair Methodologies, And A Timeline For Completion. Keywords: Repair, 300 Hp Hc Motor, Phe, State Govt. And Ut, Cps Boria, Jammu, Government Tender, Heavy Equipment Repair| Particulars | Details |
|---|---|
| Title |
Repair To 300 Hp Hc Motor Unit 01 For Narwal Installed At Cps Boria Under Non Plan
|
| Description |
Repair To 300 Hp Hc Motor Unit 01 For Narwal Installed At Cps Boria Under Non Plan
|
| Organisation | PHE | State Govt. and UT |
| Tender Id | 2024_PHE_248439_1 |
|
Reference Number |
e-NIT PHEJ/MS/01 of 2024-25 Dated 04-05-2024 |
| Tender Fee | 200 |
| EMD | 0 |
| Tender Value | - |
| Place | Jammu |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=724344 |
| Start Date | May 07, 2024 15:30 |
| End Date |
Expired
13/05/2024
Expired 883 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Spares suitable for siemens make 420 kv,2000amps,tp 415v motor operated centre break isolator with single earth switch type 400 kv hcb installed at 400 kv switchyard
Spares suitable for siemens make 420 kv,2000amps,tp 415v motor operated centre break isolator with single earth switch type 400 kv hcb installed at 400 kv switchyard
Read moreSupply of 62 hp submersible pump motor along with 16 sqmm, 3 core, flat submersible copper cable required for pumping of raw water from el+750 stage to el+1076 stage ,spare monoblock motor for sri giri guest house (sggh) and spare monoblock and booster pump motors for krishna veni guest house (kvgh) at slbhes, srisailam dam west
Supply of 62 hp submersible pump motor along with 16 sqmm, 3 core, flat submersible copper cable required for pumping of raw water from el+750 stage to el+1076 stage ,spare monoblock motor for sri giri guest house (sggh) and spare monoblock and booster pump motors for krishna veni guest house (kvgh) at slbhes, srisailam dam west
Read moreMajor repair to the rotor of 335 hp hc pump motor unit 04 for narwal installed at cps boria under non plan
Major repair to the rotor of 335 hp hc pump motor unit 04 for narwal installed at cps boria under non plan
Read moreDismantling of 435 hp motor of unit no 05 installed at cps boria under non plan
Dismantling of 435 hp motor of unit no 05 installed at cps boria under non plan
Read moreReplacement of components to lt control panel of tubewell no 6 boria and gorkha nagar for 50 hp hc motor installed at cps boria
Replacement of components to lt control panel of tubewell no 6 boria and gorkha nagar for 50 hp hc motor installed at cps boria
Read moreProviding and fitting of components to 1.0 lac gph x 120 mtr head x 300 hp hc pump unit - 01 for water supply to narwal installed at cps boria
Providing and fitting of components to 1.0 lac gph x 120 mtr head x 300 hp hc pump unit - 01 for water supply to narwal installed at cps boria
Read moreReplacement of components to ats control panel of 240 hp motor installed at cps narwal under non plan
Replacement of components to ats control panel of 240 hp motor installed at cps narwal under non plan
Read moreRepair to 422 hp rotor along pumping unit 11 installed at cps boria under non plan
Repair to 422 hp rotor along pumping unit 11 installed at cps boria under non plan
Read moreRepairs to 1.00 lac gph x 120 mtr. hc pumping unit - 09 installed at cps boria under non plan
Repairs to 1.00 lac gph x 120 mtr. hc pumping unit - 09 installed at cps boria under non plan
Read moreOverhauling of 50000 gph x 158 mtr head x 250 hp hc pump motor set for water supply to bahu unit 1 installed at cps boria under non plan
Overhauling of 50000 gph x 158 mtr head x 250 hp hc pump motor set for water supply to bahu unit 1 installed at cps boria under non plan
Read moreof your Industry type