Tender Details
Particulars | Details |
---|---|
Title |
Providing And Fitting Of Components To Lt Control Panel Of Unit No 10 Installed At Cps Boria Under Non Plan
|
Description |
Providing And Fitting Of Components To Lt Control Panel Of Unit No 10 Installed At Cps Boria Under Non Plan
|
Organisation | PHE | State Govt. and UT |
Tender Id | 2024_PHE_243218_1 |
Reference Number |
PHEJ/MS/122 of 2023-24 Dated 18-01-2024 |
Tender Fee | 200 |
EMD | 0 |
Tender Value | |
Place | Jammu |
Link | https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=712772 |
Start Date | January 19, 2024 15:30 |
End Date |
25/01/2024 ( Expired 472 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreImplementation of a turnkey project for providing voice and data network over ofc with futuristic plan for integration of surveillance equipments on 08 nos ib deployed units under ftr hq jammu
Implementation of a turnkey project for providing voice and data network over ofc with futuristic plan for integration of surveillance equipments on 08 nos ib deployed units under ftr hq jammu
Read moreProviding road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreSurface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreChambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25
Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
Read moreDemolition and reconstruction of bldg no p 9 to p 14 single or living accn at bikaner military station
Demolition and reconstruction of bldg no p 9 to p 14 single or living accn at bikaner military station
Read moreUpgradation of rural road from sh connection (near shree rama temple) to sipu and laxmi priya bazar at hut bay
Upgradation of rural road form sh connection (near shree rama temple) to sipu and laxmi priya bazar at hut bay, south andaman under pmgsy-iii, batch-i, 2024-25 (package no an01hb23, length 1.372 km)
Read moreof your Industry type