Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cleaning Of Overflowed Coal Between Guard Walls Besides Yard Conveyors 7 A And 110 And Outside Yard Guard Walls At Chp,Bktpp
|
| Description |
Cleaning Of Overflowed Coal Between Guard Walls Besides Yard Conveyors 7 A And 110 And Outside Yard Guard Walls At Chp,Bktpp
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2024_WBPDC_772008_1 |
|
Reference Number |
WBPDCL/BKTPP/NIT/E3420/24-25 |
| Tender Fee | 0 |
| EMD | 6751 |
| Tender Value | - |
| Place | Bakreswar Thermal Power Project |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1709326 |
| Start Date | November 22, 2024 22:30 |
| End Date |
Expired
06/12/2024
Expired 681 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreImprovement works to the damaged cable trench brick walls and replacing the damaged precast cover slabs with new ones at 110/11 kv yard in the sattur ss premises.
Improvement works to the damaged cable trench brick walls and replacing the damaged precast cover slabs with new ones at 110/11 kv yard in the sattur ss premises.
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreHold back assemblies for conveyors-3,4 7a/b and 8a/b gear boxes for mm-chp
Hold back assemblies for the conveyors-3,4, 7a/b and 8a/b gear boxes for mm-chp
Read moreAnnual maintenance contract for picking of stone and foreign materials from running conveyors of chp, bktpp
Annual maintenance contract for picking of stone and foreign materials from running conveyors of chp, bktpp
Read moreComprehensive annual maintenance contract of signalling system at chp yard of bktpp for two years
Comprehensive annual maintenance contract of signalling system at chp yard of bktpp for two years
Read moreComprehensive annual maintenance contract of signalling system at chp yard of bktpp for two years
Comprehensive annual maintenance contract of signalling system at chp yard of bktpp for two years
Read moreMw(sr) repairs and strengthening works to the masonry walls which are in dilapidated conditio beside excavation area and besides dressing hall and dome portion of ladies body guard area in golconda fort
Removal of debris with boulders, leveling the undulated ground etc as per rfp and directions of asi officials
Read moreRepairs and strengthening works to themasonry walls which are in dilapidated condition beside excavation area and besides dressing hall and dome portion of ladies body guard area in golconda fort - execution of work
Erection of scaffolding to the clapping portico for lime puning and removal of peeled off lime punning on damaged surfaces and providing lime punning to the inner surfaces
Read moreManual picking of stones coming along with coal from running conveyors and their further disposal in scrap yard at 2 x 210 mw 2 x 250 mw chp ghtp lehra mohabat distt bathinda
Manual picking of stones coming along with coal from running conveyors and their further disposal in scrap yard at 2 x 210 mw 2 x 250 mw chp ghtp lehra mohabat distt bathinda
Read moreof your Industry type