Tender Details

Particulars Details
Title
Fabrication And Erection Of Safety Guards For Conveyor Walkway Area In Western Chp, Nigahi Project
Description
Fabrication And Erection Of Safety Guards For Conveyor Walkway Area In Western Chp, Nigahi Project
Organisation Northern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_NCL_331932_1
Reference
Number
NGH/EM/e-Tender/24-25/58 dtd. 10.03.2025
Tender Fee 0
EMD 17400
Tender Value -
Place NCL Nigahi Area
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=344099

Start Date March 11, 2025 16:30
End Date
Expired 21/03/2025

Expired 569 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Tggenco-ktps-vii stage-mm-chp- procurement of bearing and sleeves for conveyor pulleys, various gearboxes, sump pumps, fluid couplings and esc-584 scoop couplings

Tggenco-ktps-vii stage-mm-chp- procurement of bearing and sleeves for conveyor pulleys, various gearboxes, sump pumps, fluid couplings and esc-584 scoop couplings

Read more
Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru

Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru

Read more
Supply, fabrication, erection, testing and commissioning of 30meter hight ms structural steel chimney work at opp kallurugudem, khammam dist,telangana state.

Supply, fabrication, erection, testing and commissioning of 30meter hight ms structural steel chimney work at opp kallurugudem, khammam dist,telangana state.

Read more
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Read more
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Read more
Fabrication and erection of safety guards for conveyor walkway area in western chp, nigahi project

Fabrication and erection of safety guards for conveyor walkway area in western chp, nigahi project

Read more
Fabrication and erection of safety guards for conveyor walkway area in western chp, nigahi project

Fabrication and erection of safety guards for conveyor walkway area in western chp, nigahi project

Read more
Fabrication and erection of storage racks for chp store of nigahi chp

Fabrication and erection of storage racks for chp store of nigahi chp

Read more
Dismantling, fabrication and erection of take up trolley of the conveyor 2c and discharge chute of the double roll crusher at western chp nigahi project

Dismantling, fabrication and erection of take up trolley of the conveyor 2c and discharge chute of the double roll crusher at western chp nigahi project

Read more
Fabrication of impact pad frame installed at phase -iii nigahi chp

Fabrication of impact pad frame installed at phase -iii nigahi chp

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise