Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fabrication And Erection Of Safety Guards For Conveyor Walkway Area In Western Chp, Nigahi Project
|
| Description |
Fabrication And Erection Of Safety Guards For Conveyor Walkway Area In Western Chp, Nigahi Project
|
| Organisation | Northern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_NCL_331932_1 |
|
Reference Number |
NGH/EM/e-Tender/24-25/58 dtd. 10.03.2025 |
| Tender Fee | 0 |
| EMD | 17400 |
| Tender Value | - |
| Place | NCL Nigahi Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=344099 |
| Start Date | March 11, 2025 16:30 |
| End Date |
Expired
21/03/2025
Expired 569 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco-ktps-vii stage-mm-chp- procurement of bearing and sleeves for conveyor pulleys, various gearboxes, sump pumps, fluid couplings and esc-584 scoop couplings
Tggenco-ktps-vii stage-mm-chp- procurement of bearing and sleeves for conveyor pulleys, various gearboxes, sump pumps, fluid couplings and esc-584 scoop couplings
Read moreSupply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru
Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru
Read moreSupply, fabrication, erection, testing and commissioning of 30meter hight ms structural steel chimney work at opp kallurugudem, khammam dist,telangana state.
Supply, fabrication, erection, testing and commissioning of 30meter hight ms structural steel chimney work at opp kallurugudem, khammam dist,telangana state.
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreFabrication and erection of safety guards for conveyor walkway area in western chp, nigahi project
Fabrication and erection of safety guards for conveyor walkway area in western chp, nigahi project
Read moreFabrication and erection of safety guards for conveyor walkway area in western chp, nigahi project
Fabrication and erection of safety guards for conveyor walkway area in western chp, nigahi project
Read moreFabrication and erection of storage racks for chp store of nigahi chp
Fabrication and erection of storage racks for chp store of nigahi chp
Read moreDismantling, fabrication and erection of take up trolley of the conveyor 2c and discharge chute of the double roll crusher at western chp nigahi project
Dismantling, fabrication and erection of take up trolley of the conveyor 2c and discharge chute of the double roll crusher at western chp nigahi project
Read moreFabrication of impact pad frame installed at phase -iii nigahi chp
Fabrication of impact pad frame installed at phase -iii nigahi chp
Read moreof your Industry type