Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Annual Maintenance Contract For Picking Of Stone And Foreign Materials From Running Conveyors Of Chp, Bktpp
|
| Description |
Annual Maintenance Contract For Picking Of Stone And Foreign Materials From Running Conveyors Of Chp, Bktpp
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_WBPDC_557150_1 |
|
Reference Number |
WBPDCL/BKTPP/NIT/E2714/23-24 |
| Tender Fee | 0 |
| EMD | 5.63 Lakh |
| Tender Value | - |
| Place | The chamber of Sr.Mgr. (CC),BKTPP |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | September 09, 2023 21:00 |
| End Date |
Expired
23/09/2023
Expired 1116 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of impact idlers for chp conveyors
Procurement of impact idlers for chp conveyors for 1000 mt capacity (2 x 270 mw units)
Read moreBelt monitoring system for critical conveyors of chp unit1&2.
Supply, erection & commissioning of belt monitoring system for critical conveyors of chp.
Read moreProcurement of gearbox holdbacks for coal conveyors of chp ntpc sipat
Procurement of gearbox holdbacks for coal conveyors of chp ntpc sipat
Read moreCustom bid for services - annual rate contract for manual picking of stones/boulders and other extraneous materials from running conveyor belts (3a/b & 10a/b) of coal handling plant of dstps (2x500mw), dvc, andal
Custom bid for services - annual rate contract for manual picking of stones/boulders and other extraneous materials from running conveyor belts (3a/b & 10a/b) of coal handling plant of dstps (2x500mw), dvc, andal
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreEv truck with charger 01 tyre with wheel rim accessories if any erection and commissioning along with standard tools and tackles price must be inclusive of 2 sets of battery chargers for 4 dumpers,1st year cost cap price - 3500 running hrs per dumper,2nd year cost cap price npv applicable - 3500 running hrs per dumper,3rd year cost cap price npv applicable - 3500 running hrs per dumper,4th year cost cap price npv applicable - 3500 running hrs per dumper,5th year cost cap price npv applicable - 3500 running hrs per dumper
Ev truck with charger 01 tyre with wheel rim accessories if any erection and commissioning along with standard tools and tackles price must be inclusive of 2 sets of battery chargers for 4 dumpers,1st year cost cap price - 3500 running hrs per dumper,2nd year cost cap price npv applicable - 3500 running hrs per dumper,3rd year cost cap price npv applicable - 3500 running hrs per dumper,4th year cost cap price npv applicable - 3500 running hrs per dumper,5th year cost cap price npv applicable - 3500 running hrs per dumper
Read moreHiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.
Hiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreStone boulders and foreign material picking from running conveyors in
Stone boulders and foreign material picking from running conveyors inchp for ntpc lara.
Read moreof your Industry type