Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
04/Se/C Ii/R B/Kmda/ W 28 (Part Vii) Of 2024 2025 Date 08/07/2024
|
| Description |
Construction Of Footpath Between Service Road Attached To E.M. Bypass And G4 Storied Building Named Paradise At Dakshin Madhya Fartabad (Opposite To Yuba Tirtha Club) For The Benefit Of The Local People.
|
| Organisation | KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY | State Govt. and UT |
| Tender Id | 2024_KMDA_709266_1 |
|
Reference Number |
04/SE/C-II/R B/KMDA/ W-28 (Part-VII) of 2024-2025 DATE -08/07/2024 |
| Tender Fee | 0 |
| EMD | 6203 |
| Tender Value | - |
| Place | Dakshin Madhya Fartabad (Opposite to Yuba Tirtha |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1553221 |
| Start Date | July 09, 2024 15:00 |
| End Date |
Expired
19/07/2024
Expired 771 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
08/se/c-ii/r b/kmda/ w-28 (part-vii) of 2024-2025 date-28/08/2024
Construction of steel-rcc composite bridge of 22m length, 5.5 m carriageway width with both side footpath in place of damaged wooden bridge over town head canal at mir meher ali lane at ward no.57 of kmc, ps- tangra.
Read more07/se/c-ii/r b/kmda/ w-28 (part-vii) of 2024-2025 date -31/07/2024
Cleaning and sweeping of carriageways, crash barriers of both flank of ultadanga flyover for 13 (thirteen) months i.e. from 1st dec_2024 to 31st dec_2025
Read more04/se/c-ii/r b/kmda/ w-28 (part-vii) of 2024-2025 (2nd call) date -22/07/2024
Construction of footpath between service road attached to e.m. bypass and g plus 4 storied building named paradise at dakshin madhya fartabad (opposite to yuba tirtha club) for the benefit of the local people
Read more03/se/c-ii/r b/kmda/ w-28 (part-vii) of 2024-2025 date -03/07/2024
Improvement of existing bituminous surface along with other allied works as an immediate measure of maa saradamoni setu (r.c.c bridge).
Read more05/se/c-ii/r b/kmda/ w-28 (part-vii) of 2024-2025 date -10/07/2024
Making and installation of 4 (four) nos. traffic kiosk over samprity flyover under maheshtala ps for surveillance and safety and security of human life and public convenience.
Read more03/se/c-ii/r b/kmda/ w-28 (part-vii) of 2024-2025 date -24/07/2024
Improvement of existing bituminous surface along with other allied works as an immediate measure of maa saradamoni setu (r.c.c bridge).
Read more06/se/c-ii/r b/kmda/ w-28 (part-vii) of 2024-2025 date -31/07/2024
Emergent repair involves the mending pot holes and patch repair of the carriageway, minor repairs and paint, including uprooting the plants of vidyapati setu at sealdah
Read more04/se/c-i/rb/kmda/ w-03 (part-i) of 2024-2025 date- 08/07/2024
Installation of road marking and raised pavement markers at east bound and west bound ramps of maa flyover
Read more07/se/c-ii/r b/kmda/ w-28 (part-vii) of 2024-2025 (2nd call) date -12/09/2024
Cleaning and sweeping of carriageways, crash barriers of both flank of ultadanga flyover for 13 (thirteen) months i.e. from 1st dec_2024 to 31st dec_2025
Read more07/se/c-ii/r b/kmda/ w-28 (part-vii) of 2024-2025 (3rd call) date -18/11/2024
Cleaning and sweeping of carriageways, crash barriers of both flank of ultadanga flyover for 13 (thirteen) months i.e. from 1st dec_2024 to 31st dec_2025
Read moreof your Industry type