Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Various Ipb Streets In Shastri Nagar Ward No 18 Mc Hisar
|
Description |
Construction Of Various Ipb Streets In Shastri Nagar Ward No 18 Mc Hisar
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 6180 |
EMD | 99940 |
Tender Value | |
Place | Hisar |
Link |
AAAAAAAAAA Login to view |
Start Date | June 27, 2025 21:30 |
End Date |
08/07/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreTolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)
Tolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)
Read moreConstruction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreConstruction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Construction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Read moreConsultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Consultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Read moreConsultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.
Consultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.
Read moreConsultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Read moreAAAAAAAAAA
Login to viewEoi for empanelment of architects for various construction works in dr. b.r.ambedkar nit,jalandhar
Read moreConstruction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode
Construction of road kibithu kundao from km 0.000 to km 52.000
 design length 0.000 to 19.557 kms green field alignment to nhsl
 specifications under project udayak in anjaw district of arunachal
 pradesh state on epc mode
Read moreof your Industry type