Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Anganwadi Centre At Mohanpur I Under Sub Division Iii, Cd, Apwd, Diglipur
|
| Description |
Construction Of Anganwadi Centre At Mohanpur I Under Sub Division Iii, Cd, Apwd, Diglipur
|
| Organisation | Chief Engineer Andaman Public Works Department (APWD) | State Govt. and UT |
| Tender Id | 2024_APWD_15237_1 |
|
Reference Number |
NIT No. 50/EE/CD/APWD/DP/2024-25 |
| Tender Fee | 0 |
| EMD | 40759 |
| Tender Value | - |
| Place | Anganwadi Centre Mohanpur-I, Diglipur |
| Link |
View Original Tender Notice
https://eprocure.andaman.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=16117 |
| Start Date | August 22, 2024 15:30 |
| End Date |
Expired
29/08/2024
Expired 730 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Resurvey of malali rf block i,ii, iii reserved forest, with its boundary length measuring approximately 41.20 km in nagara range, sagara division, during 2026-27.
Resurvey of malali rf block i,ii, iii reserved forest, with its boundary length measuring approximately 41.20 km in nagara range, sagara division, during 2026-27.
Read moreDemarcation of surveyed boundary of harkur rf extn block bit i ii iii reserve forest by construction of 18 rcc pillars of specified dimensions at the given locations along the notified forest boundary in kundapura range of kundapura division during 2026-27.
Demarcation of surveyed boundary of harkur rf extn block bit i ii iii reserve forest by construction of 18 rcc pillars of specified dimensions at the given locations along the notified forest boundary in kundapura range of kundapura division during 2026-27.
Read moreUp-gradation of rural road connect from subcenter to monimohan biswas house gandinagar ward 3 to old jetty 17 family to 8 family sea beach via sub center starting from sagardeep old jetty to smith village sea shore under pmgsy-iii, batch-i, 2024-25
Up-gradation of rural road connect from subcenter to monimohan biswas house gandinagar ward 3 to old jetty 17 family to 8 family sea beach via sub center starting from sagardeep old jetty to smith village sea shore under pmgsy-iii, batch-i, 2024-25
Read moreResurvey of balpa rf block bit i, ii & iii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 6.75 km in panja range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Resurvey of balpa rf block bit i, ii & iii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 6.75 km in panja range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Read moreConstruction of anganwadi center at mohanpur-i, under sub division-iii, cd, apwd, diglipur. sw providing iei
Construction of anganwadi center at mohanpur-i, under sub division-iii, cd, apwd, diglipur. sw providing iei
Read moreConstruction of anganwadi centre at nabagram-i under sd-iii, cd, apwd., diglipur
Construction of anganwadi centre at nabagram-i under sd-iii, cd, apwd., diglipur
Read moreConstruction of anganwadi center at nabagram-i, under sub division-iii, cd, apwd, diglipur. sw- providing iei
Construction of anganwadi center at nabagram-i, under sub division-iii, cd, apwd, diglipur. sw- providing iei
Read moreRenovation of sub-depot at mohanpur under sd-iii, cd, apwd., diglipur
Renovation of sub-depot at mohanpur under sd-iii, cd, apwd., diglipur
Read moreConstruction of new anganwadi centre at lamiyabay with chain link fencing under sub division-i, cd, apwd, diglipur
Construction of new anganwadi centre at lamiyabay with chain link fencing under sub division-i, cd, apwd, diglipur
Read moreConstruction of anganwadi centre at nischintapur under sd-iii, cd, apwd, diglipur
Construction of anganwadi centre at nischintapur under sd-iii, cd, apwd, diglipur
Read moreof your Industry type