Tender Details

Particulars Details
Title
Construction Of Protecsion Hut At Naag Cn638
Description
Construction Of Protecsion Hut At Naag Cn638
Organisation Head Of Forest Force Nagpur Maharashtra State | State Govt. and UT
Tender Id 2024_HFFN_1101198_1
Reference
Number
Dy.CFWL/THANE/NIT/09/2024-25
Tender Fee 1500
EMD 19909
Tender Value -
Place Naagset
Link
View Original Tender Notice

https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1922794

Start Date October 02, 2024 14:30
End Date
Expired 08/10/2024

Expired 726 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.

Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.

Read more
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.

Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.

Read more
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years

Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.

Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.

Read more
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Read more
Consultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh

Consultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh

Read more
Rfp for cluster-10 of iti kothagudem hub

Rfp for cluster-10 of iti kothagudem hub

Read more
Cunstruction of protecsion hut at pivali cn911

Cunstruction of protecsion hut at pivali cn911

Read more
Cunstruction of protecsion hut at nandgav cn961

Cunstruction of protecsion hut at nandgav cn961

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise