Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Const. Of C. C Road And Nali From Sadak To H/O Shri Jatis Via H/O Shri Jaivindra In Village Ghumarra,Mainpuri.
|
| Description |
Const. Of C. C Road And Nali From Sadak To H/O Shri Jatis Via H/O Shri Jaivindra In Village Ghumarra,Mainpuri.
|
| Organisation | Director Cum Chief Engineer RED | State Govt. and UT |
| Tender Id | 2025_REDUP_1066944_6 |
|
Reference Number |
1262/EE/RED/04-08-2025 |
| Tender Fee | 854 |
| EMD | 39000 |
| Tender Value | |
| Place | Mainpuri |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1946296 |
| Start Date | August 21, 2025 20:30 |
| End Date |
Expired
04/09/2025
Expired 314 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of a drain and road in saurabh nagar located on gram dahtaura road, extending from shri munesh salon to shri vijay kumar pandits house.
Construction of a drain and road in saurabh nagar located on gram dahtaura road, extending from shri munesh salon to shri vijay kumar pandits house.
Read moreStrengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreConstruction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Read moreCa no.cwe bly/ge (w)/52 of 2026- 2027special repairs to foothpath and allied works from jat annxe to shaheed chowk and krishna road (kr) marge under ge (west) bareilly
Ca no.cwe bly/ge (w)/52 of 2026- 2027special repairs to foothpath and allied works from jat annxe to shaheed chowk and krishna road (kr) marge under ge (west) bareilly
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreIe services during onm period of tolling operation maintenance n transfer of 1.raipur to sa sec of nh30 old nh200 from km0.000 to km48.580 2.sa to bilaspur sec of nh130 old nh200 n nh49 from km.48.580 to km.126.525 in chhattisgarh
Ie services during onm period of tolling operation maintenance n transfer of 1.raipur to sa sec of nh30 old nh200 from km0.000 to km48.580 2.sa to bilaspur sec of nh130 old nh200 n nh49 from km.48.580 to km.126.525 in chhattisgarh
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreConstruction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Read moreof your Industry type