Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Pwrjt24063/Annual Rate Contract (Arc) For Civil Works At Wrpl, Rajkot Pump Station For The Period Of Two Years
|
Description |
Pwrjt24063/Annual Rate Contract (Arc) For Civil Works At Wrpl, Rajkot Pump Station For The Period Of Two Years
|
Organisation | IndianOil | Central Govt. Ministry/Department |
Tender Id | 2024_WRRAJ_181570_1 |
Reference Number |
PWRJT24063 |
Tender Fee | 0 |
EMD | 17700 |
Tender Value | |
Place | Rajkot Pump Station |
Link | https://iocletenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=192158 |
Start Date | November 21, 2024 21:30 |
End Date |
28/11/2024 ( Expired 221 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Civil works of pre-cast rcc cover slab and other miscellaneous works for cable trench at 132 kv switchyard area within ipr campus, bhat, gandhinagar -382428.
Civil works of pre-cast rcc cover slab and other miscellaneous works for cable trench at 132 kv switchyard area within ipr campus, bhat, gandhinagar -382428.
Read moreHiring services of one no. brand new mahindra scorpio classic s 2wd bs6 2.0 model base model with driver and all fittings and accessories for a period of 4 years for telecom and instrumentation section, pump station 3, jorhat.
Hiring services of one no. brand new mahindra scorpio classic s 2wd bs6 2.0 model base model with driver and all fittings and accessories for a period of 4 years for telecom and instrumentation section, pump station 3, jorhat.
Read moreCivil work for construction of 01 no. 33 kv ais bay for m/s noida international airport pvt. ltd. at 220/33 kv hybrid sub-station jewar
Civil work for construction of 01 no. 33 kv ais bay for m/s noida international airport pvt. ltd. at 220/33 kv hybrid sub-station jewar
Read moreCivil work for construction of 01 no. 220 kv ais bay at 220/33 kv sub station yeida sector-18
Civil work for construction of 01 no. 220 kv ais bay at 220/33 kv sub station yeida sector-18
Read moreOperation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Operation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Read moreHiring services of 1 no. brand new honda amaze 1.2 emt petrol base model vehicle for plying at phq, narengi, guwahati for a period 4 years
Hiring services of 1 no. brand new honda amaze 1.2 emt petrol base model vehicle for plying at phq, narengi, guwahati for a period 4 years
Read moreSelection of an agency to provide jcb for housekeeping work in ffp,hmbp, hmtp and ta div and demolition work in ta division for a period of one year through rate contract
Selection of an agency to provide jcb for housekeeping work in ffp,hmbp, hmtp and ta div and demolition work in ta division for a period of one year through rate contract
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreOpen e-tender cum e-auction bid document for provision of catering services in refreshment room at kazipet railway station for a period of 5 years.
Open e-tender cum e-auction bid document for provision of
 catering services in refreshment room at kazipet railway station for a period of 5 years.
Read moreEmpanelment of electrical contractors for a period of two years for supply of material erection testing commissioning of augmentation of existing 33 kv sub stations and lines construction of new 33 kv lines augmentation of existing 33 kv lines and
Empanelment of electrical contractors for a period of two years for supply of material erection testing commissioning of augmentation of existing 33 kv substations and lines construction of new 33 kv lines augmentation of existing 33 kv lines
Read moreof your Industry type