Tender Details
Particulars | Details |
---|---|
Title |
Power Cable Lab,Control Cable No 5,Control Cable No 1
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id | GEM/2025/B/6226359 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | May 13, 2025 22:19 |
End Date |
03/06/2025 ( Expired 5 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreCa no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Read morePrototype 1,prototype 2,prototype 3,prototype 4,prototype 5,bulk 1,bulk 2,bulk 3,bulk 4,bulk 5
Read more
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreImplementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read more(mahapour nidhi) construction of b.t. road at gul mohar city ward no. 60 zone no. 14 18/25x3/5
(mahapour nidhi) construction of b.t. road at gul mohar city ward no. 60 zone no. 14 18/25x3/5
Read moreProviding of electric water chiller 2000 ltr with tata yodha pickup vehicle at ward no. 32 nagar nigam gwalior (maulik nidhi) file no. 197/25x9/1
Providing of electric water chiller 2000 ltr with tata yodha pickup vehicle at ward no. 32 nagar nigam gwalior (maulik nidhi) file no. 197/25x9/1
Read moreRising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint
Rising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint
Read moreof your Industry type