Tender Details

Particulars Details
Title
Erection/Installation And Survey Of Boundary Pillars At Shagan Forest (Main Line 150 Chak 171) Of
Description
Boq
Organisation Government of Jammu and Kashmir
Tender Id 2023_FD_232529_2
Reference
Number
e Nit 79 of 2023-24
Tender Fee 800
EMD 49741
Tender Value
Place DFO Office Ramban
Link
View Original Tender Notice

https://jktenders.gov.in

Start Date November 13, 2023 18:30
End Date
Expired 23/11/2023

Expired 935 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply and erection of precast bus shelter near at mettur main road in ward no 100 south zone

Supply and erection of precast bus shelter near at mettur main road in ward no 100 south zone &amp#x0d

Read more
Repair and maintenance of main road back and cisf side boundary wall of 132/33 kv g/s/s, hatia-i

Repair and maintenance of main road back and cisf side boundary wall of 132/33 kv g/s/s, hatia-i

Read more

Construction of boundary wall from main gate to main road along with main gate and construction of entrance arch including and external electrical installations at 27 scg, nsg, regional hub chennai. sh: providing and making ornamental finishes to the columns and beams at nsg main entrance.

Read more
Nit no.02(item no.5)/(2026-27)

Construction of walk way surrounding the boundary wall for watch and ward from back side boundary wall to main gate at khyala ugr under ee(c)plant,ww-hp.

Read more
Erection installation of fixed fabricated lighting towers,installation of tanker filling point dismantling of pole mounted xformer from existing d.p. at different locations of mines of rajrappa project on as , when and where required

Erection installation of fixed fabricated lighting towers,installation of tanker filling point dismantling of pole mounted xformer from existing d.p. at different locations of mines of rajrappa project on as , when and where required

Read more
Investigation survey on g.i.s. basis and construction of stp cum co-treatment facilities 10.60 mld stp and 11.50 kld co-treatment i and d of drains and structure rising main treated effluent line with scada etc. in dadri npp dist g.b. nagar

Investigation survey on g.i.s. basis and construction of stp cum co-treatment facilities 10.60 mld stp and 11.50 kld co-treatment i and d of drains and structure rising main treated effluent line with scada etc. in dadri npp dist g.b. nagar

Read more
Construction of 220 kv transmission line from hmbd gss to hmbd tss

Survey design drawing supply erection testing and commissioning of 220 kv dc transmission line on dc towers (07 km approx.) from humnabad gss to humnabad railway traction substation (rtss) (with identification and resolution of row issues by payment

Read more
Hot line water washing of (...

Hot line water washing of (four cycles)&amp#x0d 220 kv switchyard-2 at ptps, panipat, 220 kv switchyard at dcrtpp, yamuna nagar and 400 kv switchyard at rgtpp, khedar hisar.

Read more
Outsourcing of usfd testing of at welds at nominated sections of line 2a, line 2b (phase i), line 7 and line 9 (phase i) including charkop and mandale depot for three years

Outsourcing of usfd testing of at welds at nominated sections of line 2a, line 2b (phase i), line 7 and line 9&amp#x0d (phase i) including charkop and mandale depot for three years

Read more
Erection of 25kva transformer and necessary electric installation for giving electric supply to 55 kld stp fixed in glr sy no. 129, belagavi cantonment.

Erection of 25kva transformer and necessary electric installation for giving electric supply to 55 kld stp fixed in glr sy no. 129, belagavi cantonment.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise