Tender Details

Particulars Details
Title
Periodic Maintenance Of Langhu To Jamerlla Road Km 1/0 To 2/0 And 2/0 To 3/0 Drrp No. Hp0403 Vr0065, And Link Road Harizan Basti Ustehar Km 0/0 To 0/500 Drrp No Hp0403 Vr0143 (Village Road) And Rajot Chaluhi Road Km 1/0 To 1/500(hp0411 Vr0048123) Pmgsy
Description
Providing And Laying Wbm G Ii, Prime Coat, Tack Coat And Mix Seal Surface (Pmgsy Road Amp 2024 25)
Organisation PWD | State Govt. and UT
Tender Id 2024_PWD_90503_1
Reference
Number
PWD-BD-NIT-2023-24-3433-84 dt.10.07.2024
Tender Fee 1500
EMD 55000
Tender Value
Place Baijnath
Link
View Original Tender Notice

https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=133929

Start Date July 12, 2024 20:30
End Date
Expired 25/07/2024

Expired 690 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction and maintenance of road from l069-(link road) budhan to karamkatha km 4th pmgsy road to jamlan (waste plastics), package no. jk20-4286, pmgsy-iv (batch-i, 2026-27), block thuroo, district reasi, (length - 2.525 km)

Construction and maintenance of road from l069-(link road) budhan to karamkatha km 4th pmgsy road to jamlan (waste plastics), package no. jk20-4286, pmgsy-iv (batch-i, 2026-27), block thuroo, district reasi, (length - 2.525 km)

Read more
Construction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)

Construction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)

Read more
Under the renewal item year 2026-27 renewal work by sdbc in the motor road for km 5 to of bageshwar dafaut motor road and for km 1 of bagehwar kapkot link motor road

Under the renewal item year 2026-27 renewal work by sdbc in the motor road for km 5 to of bageshwar dafaut motor road and for km 1 of bagehwar kapkot link motor road

Read more
Independent engineer services for 2 l. paved shoulders/ 4 laning of damoh jabalpur package-1 and 3 section of nh-34 from km 0.000 to km 43.500 and km 66.800 to km 101.563 under nh (o) in madhya pradesh on ham

Independent engineer services for 2 l. paved shoulders/ 4 laning of damoh jabalpur package-1 and 3 section of nh-34 from km 0.000 to km 43.500 and km 66.800 to km 101.563 under nh (o) in madhya pradesh on ham

Read more
Provision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar

Provision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar

Read more
Improvement of bada bazar old nh-5 to via- brahmun dhamana street, odia dhamana street, sankha bandha, phd, old jayashree main road to potagada of ganjam nac from 0/329 km to 1/551 km

Improvement of bada bazar old nh-5 to via- brahmun dhamana street, odia dhamana street, sankha bandha, phd, old jayashree main road to potagada of ganjam nac from 0/329 km to 1/551 km

Read more
Wbpwd/ae/dj/niet no 04 sl no 3 of 2026-2027

Regular clearance of ghoom simana road side drain and cross road drains and jungle cutting in chainage between kmp.0.00 to 16.50 kmp. under pwd, darjeeling sub division of darjeeling division during the year 2026-2027.

Read more
Charter hire of 2 two nos of dp 3 drillship modu package with equipment and crew for drilling, testing and abandonment of exploratory wells in water depths from 500 meters to 3000 meters.

Charter hire of 2 two nos of dp 3 drillship modu package with equipment and crew for drilling, testing and abandonment of exploratory wells in water depths from 500 meters to 3000 meters.

Read more
Restoration of rain damages on jia manikaran road km. 1/610 to 35/110 (sh- balance work of metalling and tarring , v-shaped drain,u-shape drain at various reached in km 1/610 to 35/110 under crf (job no crf-hp-2023 -24/188)

Restoration of rain damages on jia manikaran road km. 1/610 to 35/110 (sh- balance work of metalling and tarring , v-shaped drain,u-shape drain at various reached in km 1/610 to 35/110 under crf (job no crf-hp-2023 -24/188)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise