Tender Details
Particulars | Details |
---|---|
Title |
General Ky Ip Acp (Np) 2024 25 Jungle Clearancve And Silt Removal Of Kallur Branch Canal Ch 0 000 To 12 045 Km General Ciil Work
|
Description |
General Ky Ip Acp (Np) 2024 25 Jungle&Amp#X0d
Clearance And Silt Removal Of Kallur Branch&Amp#X0d
Canal Ch 0/000 To 12/045 Km General Civil&Amp#X0d
Work
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2024_Irrig_712495_1 |
Reference Number |
IRR/PI/TR/7004/2024_5_5_4/1 The |
Tender Fee | 1865 |
EMD | 21147 |
Tender Value | |
Place | Perambra |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1121208 |
Start Date | December 04, 2024 23:30 |
End Date |
11/12/2024 ( Expired 155 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreRehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Read moreSupply and stacking of various materials for special restoration of monsoon damages (2024-25) at various locations between km 31.450 to km 33.906 and km 91.300 to km 130.008 on sairang-tuipuibari road for permanent work and between km 124.086 to km 1
Supply and stacking of various materials for special restoration of monsoon damages (2024-25) at various locations between km 31.450 to km 33.906 and km 91.300 to km 130.008 on sairang-tuipuibari road for permanent work and between km 124.086 to km 1
Read moreConstruction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec
Construction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec
Read moreWidenning and strenthening of existing road from 3.75 to 10.00 mtr of approach road from tunkara -balara- rabriyawas to nh-158/sh-39 (ras merta highway) km 0/0 to 11/000
Widenning and strenthening of existing road from 3.75 to 10.00 mtr of approach road from tunkara -balara- rabriyawas to nh-158/sh-39 (ras merta highway) km 0/0 to 11/000
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreWidening and strengthening from achpura-kasindra road up to nh-14 (nh-27) and construction of bridge work at ch. km-3/00.
Widening and strengthening from achpura-kasindra road up to nh-14 (nh-27) and construction of bridge work at ch. km-3/00.
Read moreFormation of 4th main road (ch 0 -000 to 0-420) from marudhar rocks company to bhasaveswar temple including storm water drain, culverts in sipcot industrial park, hosur (phase ii, expansion i and ii)
Formation of 4th main road (ch 0 -000 to 0-420) from marudhar rocks company to bhasaveswar temple including storm water drain, culverts in sipcot industrial park, hosur (phase ii, expansion i and ii)
Read moreof your Industry type